SSERC · Sikkim State Electricity Regulatory Commission

Electricity Supply Code, 2012 — Third Amendment, 2025

Sikkim State Electricity Regulatory Commission (Electricity Supply Code) (Third Amendment) Regulations, 2025

AmendmentDated 11 Aug 2025Published in the Gazette 12 Aug 2025No. 436/SSERC/2024-25/05 dated 11.08.2025

Amends the Electricity Supply Code Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Sikkim's electricity supply code has been amended for the third time by a notification issued by the Sikkim State Electricity Regulatory Commission on 11 August 2025 and published in the State Gazette the next day (p1). It is made under section 181(1) and (2) read with section 61 of the Electricity Act, 2003, comes into force on gazette publication, and applies to all distribution and transmission licensees and to consumers throughout Sikkim (p1).

Clauses 2 and 3 add two definitions to Regulation 1.2(1) of the 2012 Principal Regulations — 'Owner' and 'Resident Welfare Association' (p1). Clause 4 inserts a new Regulation 3.5A on service connections to an Association: the licensee must give either a single point connection or individual connections according to the majority choice of flat/house owners, ascertained by a transparent ballot, with individual connections where more than half the owners prefer them, and must also give a separate connection for EV charging on request (p2).

Clause 5 replaces sub-regulation 3.8(1), setting supply timelines for connections feasible from the existing network by area type (metropolitan, municipal, rural, HT), a longer period where mains extension or a new substation is required, an approval route for new substations with an exemption where the substation is already in a Commission-approved investment plan, and a carve-out for delays from right of way, land acquisition and compensation (p2).

Clause 6 rewrites Regulation 7.6 on meters that stop or fail to record — consumer intimation, testing within a set period, and an additional verification meter where readings do not match consumption (p3). Clause 7 inserts Regulation 8.1A on metering, billing and collection for Associations, separating licensee supply, Association-supplied backup power and common-area consumption; for single point connections the Association handles metering, billing and collection on a no-profit-no-loss basis, subject to a ceiling linked to the average low-tension domestic billing rate and a cap on total billing (p3).

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Billing and payment, Metering

Read with this

The regulation

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document