Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Electricity Supply Code Regulations, 2012

Sikkim State Electricity Regulatory Commission (Electricity Supply Code) Regulations, 2012

RegulationDated 3 Apr 2012Published in the Gazette 13 Apr 2012No. 04/SSERC/ESC/2012 dated the 3rd April, 2012

3 amendments to it are on Voltaic, the latest dated 11 Aug 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software, from pages 1 to 34 of 82. Check the regulator's original before you rely on it.

This is the principal Sikkim state supply-code regulation. The notification is dated 3 April 2012 and gazetted 13 April 2012 (p1); it is made under the Electricity Act 2003 and related instruments and applies to all distribution licensees and their consumers in Sikkim, coming into force on gazette publication (p1).

Chapter 1 (pp1–8) contains the short title, commencement, extent and applicability, a long set of definitions, interpretation rules, precedence over existing Terms & Conditions of Supply, and a standing review committee with an annual amendment and consultation process. Chapter 2 (pp9–10) specifies the system of supply — frequency, declared voltages, voltage-variation limits — and classifies consumers by supply voltage and connected load, leaving tariff categories to Commission tariff orders. Chapter 3 (pp11–16) deals with new service connections: the licensee's duty to supply, exceptions, application forms and documents, service line, multi-storey connections, connection cost, consumer-executed works, timeframes and consumer-owned transformer maintenance. Chapter 4 (pp17–25) sets wiring and apparatus rules for consumer premises: IE Rules/BIS conformity, mains, switches, fuses, earthing, domestic appliance circuits, motors, power factor correction, HT/EHT controls, inspection and testing, access, load rating and self-declaration, consumer generators/inverters and parallel operation, and harmonics. Chapter 5 (pp26–28) addresses point of supply, equipment installation, dedicated feeders, licensee equipment at consumer premises, damage, ownership and fuse failure. Chapter 6 (pp29–34) covers service-connection matters: change of category, transfer/mutation, wiring changes and shifting, enhancement and reduction of contract demand/load, permanent disconnection, vacation/transfer notice and agreement execution.

Standard name
Electricity Supply Code
Primary topics
Conditions of supply, New connections and load changes, Electrical safety

Read with this

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document