Summary
Summary written by software, from pages 1 to 34 of 82. Check the regulator's original before you rely on it.
This is the principal Sikkim state supply-code regulation. The notification is dated 3 April 2012 and gazetted 13 April 2012 (p1); it is made under the Electricity Act 2003 and related instruments and applies to all distribution licensees and their consumers in Sikkim, coming into force on gazette publication (p1).
Chapter 1 (pp1–8) contains the short title, commencement, extent and applicability, a long set of definitions, interpretation rules, precedence over existing Terms & Conditions of Supply, and a standing review committee with an annual amendment and consultation process. Chapter 2 (pp9–10) specifies the system of supply — frequency, declared voltages, voltage-variation limits — and classifies consumers by supply voltage and connected load, leaving tariff categories to Commission tariff orders. Chapter 3 (pp11–16) deals with new service connections: the licensee's duty to supply, exceptions, application forms and documents, service line, multi-storey connections, connection cost, consumer-executed works, timeframes and consumer-owned transformer maintenance. Chapter 4 (pp17–25) sets wiring and apparatus rules for consumer premises: IE Rules/BIS conformity, mains, switches, fuses, earthing, domestic appliance circuits, motors, power factor correction, HT/EHT controls, inspection and testing, access, load rating and self-declaration, consumer generators/inverters and parallel operation, and harmonics. Chapter 5 (pp26–28) addresses point of supply, equipment installation, dedicated feeders, licensee equipment at consumer premises, damage, ownership and fuse failure. Chapter 6 (pp29–34) covers service-connection matters: change of category, transfer/mutation, wiring changes and shifting, enhancement and reduction of contract demand/load, permanent disconnection, vacation/transfer notice and agreement execution.
Read with this
Amendments and corrections
- Dated 2 Aug 2024Electricity Supply Code Regulations, 2012 — First Amendment, 2024
- Dated 25 Mar 2025Electricity Supply Code, 2012 — Second Amendment, 2025
- Dated 11 Aug 2025Electricity Supply Code, 2012 — Third Amendment, 2025
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of SSERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.