Skip to content

SSERC · Sikkim State Electricity Regulatory Commission

Electricity Supply Code Regulations, 2012 — First Amendment, 2024

Sikkim State Electricity Regulatory Commission (Electricity Supply Code) (First Amendment) Regulations, 2024

AmendmentDated 2 Aug 2024Published in the Gazette 2 Aug 2024No. 436/SSERC/2024-25/03 dated 02/08/2024

Amends the Electricity Supply Code Regulations, 2012.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on sserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

A short, four-page amendment by the Sikkim State Electricity Regulatory Commission to its Electricity Supply Code Regulations, 2012, notified as No. 436/SSERC/2024-25/03 and published in the Sikkim Gazette on 2 August 2024 (p1). It is in force from that publication date, extends to the whole State, and applies to distribution licensees and electricity consumers (p1).

Clause 2 (pp1–2) inserts a block of new sub-regulations after Regulation 3.3(1) of the Principal Regulations, all about how connection-related requests are handled. The licensee must publish on its website and office notice boards the full procedure for new and temporary connections, shifting of meters, service lines and premises, category change, load change and name transfer, together with office addresses, submission points, the document checklist and all applicable charges. It must build a web portal and mobile app, while the applicant keeps the choice of hard copy or electronic filing. The clause sets the acknowledgement regime — a unique registration number, a 24-hour window for hard-copy receipt — which fixes the deemed date of receipt, and requires a status-tracking mechanism. Any agreement is folded into the application form. Failure to supply within the Regulation 3.8 period, expressly extended to domestic and commercial consumers, attracts the penalty in the Appendix to the SSERC Standards of Performance Regulations, 2012.

Clause 3 (p2) omits two sub-regulations of Regulation 3.3. Clause 4 (pp2–3) rewrites meter testing: grounds for requesting a test, a 30-day test deadline, no fee at reporting, and recovery of the meter cost and test fee from the consumer where the fault is attributable to them. Clause 5 (p3) adds bill-language, bill-intimation, website-upload and one-year billing-history duties. Clause 6 (p3) shields domestic post-payment consumers who notify absence in writing and pay fixed charges in advance. Clause 7 (pp3–4) rewrites the permanent-disconnection process and the seven-day security-deposit refund and balance-settlement rules.

Standard name
Electricity Supply Code
Primary topics
New connections and load changes, Metering, Billing and payment

Read with this

The regulation

Amendments and corrections

Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on sserc.org ↗

Report an issue with this document