Summary
Summary written by software. Check the regulator's original before you rely on it.
A short, four-page amendment by the Sikkim State Electricity Regulatory Commission to its Electricity Supply Code Regulations, 2012, notified as No. 436/SSERC/2024-25/03 and published in the Sikkim Gazette on 2 August 2024 (p1). It is in force from that publication date, extends to the whole State, and applies to distribution licensees and electricity consumers (p1).
Clause 2 (pp1–2) inserts a block of new sub-regulations after Regulation 3.3(1) of the Principal Regulations, all about how connection-related requests are handled. The licensee must publish on its website and office notice boards the full procedure for new and temporary connections, shifting of meters, service lines and premises, category change, load change and name transfer, together with office addresses, submission points, the document checklist and all applicable charges. It must build a web portal and mobile app, while the applicant keeps the choice of hard copy or electronic filing. The clause sets the acknowledgement regime — a unique registration number, a 24-hour window for hard-copy receipt — which fixes the deemed date of receipt, and requires a status-tracking mechanism. Any agreement is folded into the application form. Failure to supply within the Regulation 3.8 period, expressly extended to domestic and commercial consumers, attracts the penalty in the Appendix to the SSERC Standards of Performance Regulations, 2012.
Clause 3 (p2) omits two sub-regulations of Regulation 3.3. Clause 4 (pp2–3) rewrites meter testing: grounds for requesting a test, a 30-day test deadline, no fee at reporting, and recovery of the meter cost and test fee from the consumer where the fault is attributable to them. Clause 5 (p3) adds bill-language, bill-intimation, website-upload and one-year billing-history duties. Clause 6 (p3) shields domestic post-payment consumers who notify absence in writing and pay fixed charges in advance. Clause 7 (pp3–4) rewrites the permanent-disconnection process and the seven-day security-deposit refund and balance-settlement rules.
Read with this
The regulation
- Dated 3 Apr 2012Electricity Supply Code Regulations, 2012
Amendments and corrections
- Dated 25 Mar 2025Electricity Supply Code, 2012 — Second Amendment, 2025
- Dated 11 Aug 2025Electricity Supply Code, 2012 — Third Amendment, 2025
Voltaic last read SSERC's website for final documents on 24 Nov 2026 (7 pages) and for drafts on 21 Nov 2026. A document SSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.