MERC · Maharashtra Electricity Regulatory Commission
RPO-REC Regulations, 2016 — Statement of Reasons
Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, Its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016
Statement of reasonsDated 30 Mar 2016
Replaced by Renewable Purchase Obligation and REC Framework Regulations, 2019
See that regulation for the date it took effect and for anything it keeps in force.
The commission's reasons for the Renewable Purchase Obligation, its Compliance and Implementation of REC Framework Regulations, 2016.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Statement of Reasons (SoR) issued by the Maharashtra Electricity Regulatory Commission on 30 March 2016 to accompany the MERC (Renewable Purchase Obligation, Its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016 (p1). It explains, regulation by regulation, what changed from the 2010 RPO Regulations and why, and summarises the public consultation: the draft was published with comments due 19 January 2016, extended to 15 February 2016 by a Public Notice dated 11 February 2016, and 19 entities responded (p1). The new Regulations are stated to run for FY 2016-17 to FY 2019-20, matching the Multi Year Tariff Control Period, replacing the 2010 Regulations whose operative period ends 31 March 2016 (p1).
Sections 1 and 2 cover eligible RE sources and who is obligated: hybrid RE projects are now explicitly recognised, with solar and non-solar components to be metered or accounted separately, and a catch-all lets any technology approved by both MNRE and the Commission qualify (p1–2). The minimum size at which an RPO is fastened is raised to 5 MW installed capacity / 5 MVA contract demand, with the option of a different stipulation later, and RPO for captive users and open access consumers applies only to consumption from fossil-fuel-based sources; emergency/stand-by captive plants are excluded (p2–3).
Section 3 is the core: revised solar, non-solar and total RPO trajectories over the four years, a tolerance band around the targets to absorb variation beyond an obligated entity's control, continued separate solar and non-solar targets except for a composite-target window for mid-sized licensees, captive users and open access consumers, a retained mini/micro hydro sub-target within non-solar RPO that may be met through non-solar RECs if the licensee demonstrates it cannot procure it, and a proviso on MNRE-approved in-state procurement counting towards RPO (p3–5). Section 4 shifts State Agency compliance reporting from monthly to quarterly cumulative publication (p5). Section 5 removes the exemption for captive users of fossil-fuel-based co-generation, following the Tariff Policy, 2016 (p5–6). Section 6 elaborates RPO Regulatory Charges and the shortfall Fund, including who maintains it and whether charges may be passed through to consumers (p6–7). Section 7 declines to allow switching between REC and preferential-tariff mechanisms mid-project (p7). Section 8 newly enables the Commission to issue Practice Directions (p7).
Read with this
The regulation
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.