Skip to content

MERC · Maharashtra Electricity Regulatory Commission

Renewable Purchase Obligation, its Compliance and Implementation of REC Framework Regulations, 2016

Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2016

RegulationDate not stated

Replaced by Renewable Purchase Obligation and REC Framework Regulations, 2019

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC's principal regulation framing the Renewable Purchase Obligation (RPO) in Maharashtra for the four-year Operating Period from 1 April 2016 to 31 March 2020, and setting out how the central Renewable Energy Certificate (REC) mechanism is used to comply with it (p3, p7). It applies to Distribution Licensees in the State and, subject to capacity thresholds, to captive users and open access consumers (p5, p7).

Part A (Regulations 2–3) defines the working vocabulary — Certificate, floor and forbearance price, inter-connection point, obligated entity, preferential tariff, State Agency — and states the scope of application (p3–5). Part B (Regulations 4–13) is the operative core: it lists eligible RE sources and the minimum-capacity and metering conditions attached to eligibility (p6); identifies obligated entities and the asset-size thresholds at which captive users and open access consumers become obligated (p7); fixes the Operating Period; sets yearly Solar, non-Solar and composite RPO targets in a table, with a carve-out for mini/micro hydro and a tolerance band around the target (p7–8); recognises central RECs as compliance instruments and restricts solar and non-solar obligations to matching certificate types (p8–9); assigns the State Agency (MEDA) its accreditation, computation, quarterly-publication and reporting duties (p9); lays down what Distribution Licensees, captive users and open access consumers must file and when (p9–10); and creates RPO Regulatory Charges on shortfall, including a bar on passing them to consumers (p10–11). Regulation 13 creates a Monitoring Committee under the Grid Coordination Committee (p11).

Part C (Regulation 14) gives new RE projects during the period a one-time choice between preferential tariff and the REC route, locked in for the tariff period or PPA (p11–12). Part D (Regulations 15–19) covers grid connectivity and evacuation cost responsibility, and the Commission's powers to relax, issue orders and practice directions, amend and remove difficulties (p12).

Standard name
RPO Regulations, REC Regulations
Primary topics
Renewable purchase obligation (RPO / RCO), Renewable energy certificates (REC), Renewable energy tariff

Read with this

Commencement notices and reasons

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗

Report an issue with this document