MERC · Maharashtra Electricity Regulatory Commission
Renewable Purchase Obligation and REC Framework Regulations, 2019
Maharashtra Electricity Regulatory Commission (Renewable Purchase Obligation, its Compliance and Implementation of Renewable Energy Certificate Framework) Regulations, 2019
RegulationDated 27 Dec 2019No. MERC/Tech/Regulation/2019/1232 dated 27th December 2019
1 amendment to it is on Voltaic, dated 23 Feb 2024.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This document is MERC's 2019 principal regulation on Renewable Purchase Obligation (RPO) and the implementation of the Renewable Energy Certificate (REC) framework in Maharashtra, made under sections 61, 66, 86(1)(e) and 181 of the Electricity Act, 2003. It runs to about ten pages of operative text (pp11–20), organised into Part A (General), Part B (RPO), Part C (RE Pricing) and Part D (Other Matters), with the numbered regulations spanning Regulation 1 on short title and commencement through Regulation 19 on removal of difficulties.
Part A applies the regulation to the whole State and to all matters within the State Commission's jurisdiction, and states that it applies where the Commission is to promote renewable co-generation and generation and to specify a minimum procurement percentage based on total consumption (pp11–13).
Part B is the core. It lists eligible RE sources and the conditions on grid-connected and off-grid generation, defines who is an Obligated Entity (distribution licensees, captive users above a capacity threshold, and open access consumers above a contract-demand threshold) (pp12–14), and sets the Operating Period as 1 April 2020 to 31 March 2025 (p14). It then specifies annual solar, non-solar and composite RPO targets in a table for each year of the period, the minimum nature of those targets, banking between solar and non-solar categories, a carry-forward band, rules for small licensees and older or augmented captive plants, and the means by which an obligated entity may meet its RPO (pp14–15). Later regulations deal with RECs issued under the Central Commission's framework, the State Agency's role, reporting duties of distribution licensees and of captive users and open access consumers, incentives and penalties, and a web-portal based monitoring framework with timelines and late-payment consequences (pp15–19).
Part C gives RE projects commissioned during the Operating Period a choice between competitive bidding, State Commission tariff regulations, and the REC mechanism, with the choice locked in for the tariff period or PPA validity (p19). Part D covers grid connectivity responsibility, and gives the Commission powers to relax, issue orders and practice directions, amend, and remove difficulties (pp19–20). The instrument is signed in Mumbai on 27 December 2019 and comes into force on Gazette publication (pp11, 20).
Read with this
Amendments and corrections
Commencement notices and reasons
- Dated 27 Dec 2019RPO-REC Regulations, 2019 — Statement of Reasons
- Dated 23 Feb 2024RPO and REC Framework Regulations, 2019 — First Amendment, 2024 — Statement of Reasons
Earlier drafts
- Released with the notice dated 26 Oct 2019Renewable Purchase Obligation and REC Framework Regulations, 2019 — Draft
- Released with the notice dated 26 Oct 2019Explanatory memorandum: Explanatory Memorandum for Draft RPO-REC Regulations, 2019
- Dated 26 Oct 2019Public notice: Public Notice 09/2019-20 — Consultation on three draft Renewable Energy Regulations, 2019
10 more documents belong here and are not on Voltaic: 5 drafts or notices on a draft, 3 drafts or notices on a draft not held as English text, 1 amendment not held as English text and 1 commencement notice or statement of reasons not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of MERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.