UERC · Uttarakhand Electricity Regulatory Commission
RE and Non-fossil Fuel Co-generation Tariff Regulations, 2018
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2018
RegulationDated 6 Sep 2018No. F-9 (28)/RG/UERC/2018/815 dated September 06, 2018
Replaced by RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software, from pages 1 to 33 of 58. Check the regulator's original before you rely on it.
The UERC issued these regulations on September 06, 2018 under sections 61(h), 86(1)(e) read with 181(zd) and 181(zp) of the Electricity Act, 2003 (p1). They set tariff and other terms for electricity supply from renewable energy based generating stations and non-fossil-fuel based co-generating stations in Uttarakhand to distribution licensees or local rural grids (p1). They come into force from the date of notification and remain in force for five years unless reviewed or extended; the Control Period is five years starting with FY 2018-19 (p1, p20).
Chapters 1 and 2 define scope, eligibility and general obligations. The regulations apply to new RE and co-generation stations commissioned after commencement, while Chapters 4 and 5 largely do not apply to stations commissioned earlier, whose existing tariffs continue; specified clauses and a solar thermal/PV adder still apply to them (p1–2). Eligibility is source-by-source: small hydro up to 25 MW, wind meeting WPD criteria, solar PV/thermal/canal/rooftop, biomass/biogas, non-fossil cogeneration in topping cycle, biomass gasifier, biogas, MSW, RDF and hybrid wind-solar (p11–12). New technologies need MNRE/central approval and separate tariff determination (p13). Generators must obtain environmental/statutory clearances, file DPRs and operating data, coordinate with SLDC/RLDC, comply with grid codes, install protection and amend inconsistent PPAs (p13–15). Sale of power may be to the discom, local rural grid, or third parties under open access; the discom has fixed response timelines and a tripartite arrangement is required for third-party rooftop sales (p15–16). Open access is non-discriminatory subject to surplus capacity, charges and loss adjustment (p16).
Chapter 3 sets RPO percentages for obligated entities — distribution licensees, captive users and open access consumers — for FY 2018-19 to 2022-23, with solar and non-solar trajectories, exclusion of hydro, and reciprocal carry-over once 85% compliance is achieved; rooftop/small solar generation of non-obligated entities counts toward the discom's solar RPO (p17–18).
Chapter 4 contains the tariff architecture. Generators may choose generic tariff or petition for project-specific tariff, with exclusions for small/solar/wind projects up to 1 MW; project-specific tariff is available for actual capital cost, hybrid projects, old plant, RMU and new MNRE-approved technologies (p19–20). It sets the control period, tariff period equal to useful life, PPA duration, petition requirements and forms, provisional and final tariff timelines, and the single-part or two-part tariff structure with fixed and fuel cost components (p20–23). Financial principles cover capital cost, debt-equity, interest, depreciation, RoE, working capital, O&M escalation, CDM sharing, rebate, late payment surcharge, subsidy and taxes (p24–30). Tariff recovery is linked to CUF bands and incentives, and RE stations are must-run (p30–31).
Chapter 5 gives technology-specific parameters for small hydro and biomass Rankine cycle projects, including capital cost, O&M, CUF, auxiliary consumption, station heat rate and fossil-fuel monitoring.
Read with this
Amendments and corrections
Commencement notices and reasons
2 more documents belong here and are not on Voltaic: 2 copies in another language.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.