UERC · Uttarakhand Electricity Regulatory Commission
RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023
Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023
RegulationDated 16 Aug 2023No. F-9 (34)/RG/UERC /2023/543 dated August 16, 2023
2 amendments to it are on Voltaic, the latest dated 27 Nov 2025.
Summary
Summary written by software, from pages 1 to 33 of 65. Check the regulator's original before you rely on it.
This is UERC's principal tariff regulation for renewable energy and non-fossil fuel co-generation, notified on 16 August 2023 and commencing from the date of notification; it remains in force for five years unless reviewed or extended (p1). It applies to RE-based generating stations and non-fossil fuel based co-generating stations commissioned after commencement that supply distribution licensees or local rural grids in Uttarakhand, with special carve-outs for pre-existing stations and for stations selling to third parties (p1–2).
Chapter 1 sets definitions and scope, covering concepts such as CUF, deemed generation, net/gross metering, prosumer, banking, useful life and RE sources (p3–12). Chapter 2 lays down eligibility criteria by technology, environmental clearances, generator obligations and grid-code compliance, sale-of-power routes and PPA timelines, green energy procurement by consumers, and open access for RE/captive stations (p13–19). Chapter 3 creates the Renewable Purchase Obligation framework for distribution licensees, captive users and open access consumers, including wind, hydro, solar and other RPO categories and a separate energy storage obligation (p20–22). Chapter 4 begins the tariff principles: applicability of generic versus project-specific tariffs, the five-year control period starting FY 2023-24, tariff/PPA period, petition procedure and tariff structure, followed by financial principles for capital cost, debt-equity, interest, depreciation, return on equity, working capital, O&M, CDM benefits and rebate (p23–33).
Read with this
Amendments and corrections
- Dated 20 Jun 2024RE Tariff Regulations, 2023 — First Amendment, 2024
- Dated 27 Nov 2025RE Tariff Regulations, 2023 — Second Amendment, 2025
Commencement notices and reasons
Proposed changes (drafts with no final yet)
- Dated 12 Jun 2025Solar PV, Solar Thermal and Grid Interactive Rooftop & Small Solar PV Benchmark Capital Cost Review, FY 2025-26 — Draft
- Released with the draft dated 12 Jun 2025Public notice: Public Notice — Draft Solar Benchmark Capital Cost Review Order, FY 2025-26
8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.
Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.