Skip to content

UERC · Uttarakhand Electricity Regulatory Commission

RE and Non-Fossil Fuel Co-generation Tariff Regulations, 2023

Uttarakhand Electricity Regulatory Commission (Tariff and Other Terms for Supply of Electricity from Renewable Energy Sources and non-fossil fuel based Co-generating Stations) Regulations, 2023

RegulationDated 16 Aug 2023No. F-9 (34)/RG/UERC /2023/543 dated August 16, 2023

2 amendments to it are on Voltaic, the latest dated 27 Nov 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cdnbbsr.s3waas.gov.in ↗

Summary

Summary written by software, from pages 1 to 33 of 65. Check the regulator's original before you rely on it.

This is UERC's principal tariff regulation for renewable energy and non-fossil fuel co-generation, notified on 16 August 2023 and commencing from the date of notification; it remains in force for five years unless reviewed or extended (p1). It applies to RE-based generating stations and non-fossil fuel based co-generating stations commissioned after commencement that supply distribution licensees or local rural grids in Uttarakhand, with special carve-outs for pre-existing stations and for stations selling to third parties (p1–2).

Chapter 1 sets definitions and scope, covering concepts such as CUF, deemed generation, net/gross metering, prosumer, banking, useful life and RE sources (p3–12). Chapter 2 lays down eligibility criteria by technology, environmental clearances, generator obligations and grid-code compliance, sale-of-power routes and PPA timelines, green energy procurement by consumers, and open access for RE/captive stations (p13–19). Chapter 3 creates the Renewable Purchase Obligation framework for distribution licensees, captive users and open access consumers, including wind, hydro, solar and other RPO categories and a separate energy storage obligation (p20–22). Chapter 4 begins the tariff principles: applicability of generic versus project-specific tariffs, the five-year control period starting FY 2023-24, tariff/PPA period, petition procedure and tariff structure, followed by financial principles for capital cost, debt-equity, interest, depreciation, return on equity, working capital, O&M, CDM benefits and rebate (p23–33).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Renewable energy tariff, Tariff determination, Renewable purchase obligation (RPO / RCO)

Read with this

Amendments and corrections

Proposed changes (drafts with no final yet)

8 more documents belong here and are not on Voltaic: 3 copies in another language, 3 drafts or notices on a draft and 2 drafts or notices on a draft not held as English text.

Voltaic last read UERC's website for final documents on 24 Nov 2026. A document UERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of UERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cdnbbsr.s3waas.gov.in ↗

Report an issue with this document