JSERC · Jharkhand State Electricity Regulatory Commission
Determination of Tariff for Procurement of Power from Solar PV and Solar Thermal Power Projects, 2015 — First Amendment, 2020
Jharkhand State Electricity Regulatory Commission (Determination of Tariff for Procurement of Power from Solar PV Power Project and Solar Thermal Power Project) (First Amendment) Regulations, 2020
AmendmentDated 31 Dec 2020Published in the Gazette 21 Jan 2021No.81 dated 31st December, 2020
Replaced by Solar PV and Solar Thermal Power Tariff Regulations, 2025
See that regulation for the date it took effect and for anything it keeps in force.
Amends the Solar PV and Solar Thermal Power Project Tariff Regulations, 2015.
Summary
Summary written by software. Check the regulator's original before you rely on it.
A two-page JSERC notification amending the State's 2015 solar tariff regulations. It is published in the Jharkhand Gazette Extraordinary dated 21 January 2021, the notification itself being dated 31 December 2020 (p1).
The stated object is to extend the control period of the principal regulations, in view of technology advancement in the solar sector and tariffs discovered through competitive bidding (p1). It is made under s.86(1)(a)–(c) read with (e), s.61(a)–(h) and s.62(1) of the Electricity Act 2003 (p1).
Clause 1 gives the short title and the commencement rule: the amendment is in force from the date of publication in the Jharkhand Gazette, unless reviewed earlier or extended by the Commission, and remains in force up to 31 March 2025 (p1–2).
Clause 2 makes the single substantive change: a proviso is added to Regulation 4.45 of the principal 2015 Regulations, allowing the Commission to modify the parameters set there after a prudence check on a case-to-case basis (p2).
No new control-period end date is spelled out in the operative text — the extension is carried by the 31 March 2025 sunset in clause 1.2. Signed by the Secretary of the Commission (p2).
Read with this
The regulation
- Dated 10 Nov 2015Solar PV and Solar Thermal Power Project Tariff Regulations, 2015
Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.