JSERC · Jharkhand State Electricity Regulatory Commission

Solar PV and Solar Thermal Power Project Tariff Regulations, 2015

Jharkhand State Electricity Regulatory Commission (Determination of tariff for procurement of power from solar PV power project and solar thermal power project) Regulations, 2015

RegulationDated 10 Nov 2015Published in the Gazette 20 Jan 2016No.51 dated The 10th November, 2015

Replaced by Solar PV and Solar Thermal Power Tariff Regulations, 2025

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on jserc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The JSERC solar tariff regulations, 2015, notified on 10 November 2015 and gazetted on 20 January 2016 (p1), set out how the Jharkhand Commission will determine the tariff at which Distribution Licensees buy power from grid-connected solar PV and solar thermal projects, and the terms on which such projects connect, schedule and are paid. They extend to the whole State and apply to projects commissioned on or after the issue date that sell to Distribution Licensees within Jharkhand (p5), for a control period running from gazette publication to 31 March 2020 (p1, p5), with the norms rolling over if revised regulations are not notified in time (p5).

A1 covers title, extent, commencement and validity (p1). A2 defines the working vocabulary — banking, capital and infrastructure cost, interconnection point, non-firm power, schedule, tariff period, useful life and voltage classes (p2–4). A3 scopes applicability to grid-connected PV (crystalline silicon, thin film) and CSP-based thermal projects approved by MNRE, and excludes stand-alone rural projects from Commission tariff determination (p4–5). A4 is the tariff engine: it adopts a single-part, cost-plus, levellised tariff over a 25-year useful life, lists the operational and financial parameters feeding the computation, and specifies each one separately for PV and for thermal — capital cost benchmark, CUF, auxiliary consumption, debt-equity, loan term and interest, depreciation, O&M, working capital and return on equity — closing with a summary cost-parameter table (p5–13). Project-specific tariffs are permitted on petition, with the information to be filed (p6). A5 sets the commercial and grid-interface terms: discounted wheeling; must-run status for plants of 10 MW and above and scheduling obligations from 5 MW at 33 kV and above; outage planning; reactive power charges; metering and monthly billing; a settlement period with late-payment surcharge and early-payment rebates; third-party sale rights on payment default; start-up and shutdown power drawal; banking rules and drawal restrictions; the link to the State's RPO; evacuation cost sharing up to 10 km with State reimbursement for projects of 2 MW or more; CDM revenue sharing; treatment of subsidies, incentives and taxes; and a 25-year tariff period (p13–18). A6–A8 give the Commission power to remove difficulties, amend and preserve its inherent powers (p18–19). The appendix holds the two tariff computation forms (p20–22).

Standard name
Renewable Energy Tariff Regulations
Primary topics
Tariff determination, Renewable energy tariff, Capital cost and investment

Read with this

Voltaic last read JSERC's website for final documents on 24 Nov 2026 (5 pages) and for drafts on 21 Nov 2026. A document JSERC issued after the page that lists it was read may not be held by Voltaic yet.