AERC · Assam Electricity Regulatory Commission

Multi Year Tariff Regulations, 2015 — Addendum (Appendices I and II)

Addendum - AERC MYT Regulations, 2015

CorrigendumDated 1 Sep 2015No. AERC. 396/2012/Pt.-III/4.-

Replaced by MYT Regulations, 2018 for Generation, Transmission, SLDC, Wheeling and Retail Supply

See that regulation for the date it took effect and for anything it keeps in force.

Corrects the Multi Year Tariff Regulations, 2015 — Generation, Transmission, SLDC, Wheeling and Retail Supply or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aerc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This five-page addendum from the Assam Electricity Regulatory Commission fills two annexures that the Commission says were inadvertently omitted when it issued the AERC (Terms and Conditions for Determination of Multi Year Tariff) Regulations, 2015 (notification No. AERC.396/2012/Pt/-II/13 dated 2 June 2015). It is not a standalone tariff order; it completes the 2015 MYT Regulations.

Page 1 contains the operative addendum. It adds Appendix I against Regulation 33.4 and Appendix II against Regulation 71.2, and fixes their places in the principal Regulations at pages 695 and 697. No date of issue or Gazette date is printed on the addendum itself; the only date shown is the 2015 notification date of the principal Regulations.

Appendix I (pp2–3) is a Depreciation Schedule. It lists asset groups — land, plant and machinery in generating stations, cooling towers and water systems, hydraulic works, buildings and civil works, transformers/substation equipment, switchgear, lightning arrestors, batteries, cables, overhead lines, meters, vehicles, air-conditioning, office furniture/equipment/wiring, street-light fittings, apparatus let on hire, communication equipment and IT equipment including software — and assigns each a depreciation rate, with a residual category for assets not covered.

Appendix II (pp4–5) sets the procedure for calculating the monthly Transmission System Availability Factor (TAFM). The transmission licensee computes it, the SLDC certifies it, and it is calculated separately for each AC and HVDC system, grouped by sharing of transmission charges. The appendix states how TAFM relates to the non-availability factor (NAFM), defines the variables for AC and HVDC calculations, deems certain outages as available, and excludes force majeure and grid-disturbance outages subject to conditions. It also requires detailed computation records and SLDC certification of availability reported to the Commission.

Standard name
Multi Year Tariff Regulations
Primary topics
Tariff determination, Return, financing and working capital, Transmission availability and outages

Read with this

Voltaic last read AERC's website for final documents on 30 Sep 2026. A document AERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aerc.gov.in ↗

Report an issue with this document