Skip to content

CERC · Central Electricity Regulatory Commission

Inter-State Transmission System Planning Regulations, 2018 — Statement of Reasons

Central Electricity Regulatory Commission (Planning, Coordination and Development of Economic and Efficient Inter-State Transmission System by Central Transmission Utility and other related matters) Regulations, 2018.

Statement of reasonsDated 23 Jul 2018No. L-1/220/2017-CERC dated 23rd July 2018

The commission's reasons for the ISTS Planning, Coordination and Development by CTU Regulations, 2018.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 42 of 51. Check the regulator's original before you rely on it.

What this is. This is the Statement of Reasons (SoR) issued by CERC on 23 July 2018 (p1) in the matter of the Central Electricity Regulatory Commission (Planning, Coordination and Development of Economic and Efficient Inter-State Transmission System by Central Transmission Utility and other related matters) Regulations, 2018. It is not the regulation itself: it records the comments received on the draft CERC (Transmission Planning and other related matters) Regulations, 2017 notified on 26 April 2017, the public hearing of 18.09.2017, and the Commission's reasons for accepting or rejecting each suggestion (p1).

Background and statutory framing (pp1–14). The SoR explains that ISTS planning was earlier covered by Part-3 (Planning Code) of the CERC (Indian Electricity Grid Code) Regulations, 2010 and Reg 3.7 of those regulations, and lists the reasons a separate regulation was felt necessary (pp2–3). Much of the reasoning defends the division of labour between CEA (short-term and perspective plans, advisory role), CTU (planning and development of ISTS under s.38) and RPCs (facilitation under s.29(4)); CEA's objection that CERC lacked jurisdiction to direct it is answered by reading ss.38, 73 and 79 of the Electricity Act 2003 together (pp4–14).

Regulation-by-regulation reasoning (pp14–42). On Regulation 2 (scope), draft clause 2.1 was deleted and moved to the Preamble, and the proposed Regional and Central Validation Committees were dropped (pp14–15). On Regulation 3 (definitions), the Central Repository of Generators, Central Study Committee and State Power Committee were deleted — generator data will come from CEA's National Level Data Registry System, and committee-based planning was abandoned in favour of CTU-led consultation via RPCs (pp15–20). GNA references were removed pending the separate draft GNA regulations (p18). Later sections cover the objective (pp20–21); roles and responsibilities of CEA, CTU, STU, NLDC, SLDCs, generators, Standing Committees and the now-dropped CSC/RSC (pp21–30); transparency and publication obligations on CTU (pp30–32); broad planning principles including upstream/downstream system integrity, asset utilisation and renewable planning (pp32–35); the decision that technical planning criteria will follow CEA's Transmission Planning Criteria (pp35–37); the decision not to classify upgrades at this stage (pp37–38); and detailed-procedure matters such as demand-projection guidelines, data formats and review timelines (pp38–42).

Primary topics
Network planning and investment, Connectivity and GNA, Congestion and curtailment

Read with this

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.