CERC · Central Electricity Regulatory Commission
Inter-State Transmission System Planning, Coordination and Development by CTU Regulations, 2018
Central Electricity Regulatory Commission (Planning, Coordination and Development of Economic and Efficient Inter-State Transmission System by Central Transmission Utility and other related matters) Regulations, 2018
Regulation · Gazette copyDated 23 Jul 2018Published in the Gazette 24 Aug 2018No. L-1/220/2017-CERC dated 23rd July, 2018
The Gazette copy of the ISTS Planning, Coordination and Development by CTU Regulations, 2018.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a principal CERC regulation issued on 23 July 2018 (p5) and published in the Gazette on 24 August 2018 (p1), coming into force from gazette publication (p6). It creates a planning framework for the inter-State transmission system (ISTS), with the Central Transmission Utility (CTU) as the lead planner. The preamble ties the regulation to the CTU's statutory functions under s.38(2)(b)–(d) and CERC's functions under s.79(1)(c)–(d) of the Electricity Act, 2003 (pp5–6). Regulations 1–4 give the title, commencement, objectives, scope and interpretation. The scope binds CTU, STUs, generating companies (including captive plants connected or intending to connect to ISTS), transmission and distribution licensees, RPCs, NLDC/RLDCs/SLDCs and other recognised entities, and says it operates in addition to the 2009 transmission licensing regulations, the 2010 CTU regulatory approval regulations and CERC tariff regulations (p6). Regulation 5 assigns roles: CTU plans and coordinates; NLDC/RLDCs feed operational statistics; generators supply technical data and project status; RPCs help prepare base cases and monitor matching intra-State works (pp6–7).
Regulation 6 lists what CTU must consider when augmenting ISTS, including new technologies, cost-benefit, retirement of old plant, renewable addition, RPO, black-start, reactive power and optimal resource use including power market and cross-border aspects (p7). Regulation 7 sets the planning process: at least twice-yearly planning, base cases and probabilistic system studies across seasons and renewable scenarios, preference for upgrading existing assets, mid-course corrections, website publication of scenarios and stakeholder comments, RPC recommendations, and routes to Commission approval where RPC disagrees or a scheme is strategic/grant-funded (pp7–8). Regulation 8 requires stakeholder consultation and transparency, including CEO-level consultation and deemed completion on non-response, and half-yearly website disclosure of scheme justification, studies, assumptions, comments, likely costs/tariff and upstream/downstream status (pp8–9). Regulation 9 prescribes what CTU and transmission licensees file for regulatory approval, transmission licence and tariff. Regulations 10–13 cover record custody, quarterly reporting, manpower certification, power to relax and power to remove difficulty (p10).
Read with this
The regulation
- Dated 23 Jul 2018ISTS Planning, Coordination and Development by CTU Regulations, 2018
Commencement notices and reasons
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.