ISTS Planning, Coordination and Development by CTU Regulations, 2018

Central Electricity Regulatory Commission (Planning, Coordination and Development of Economic and Efficient Inter-State Transmission System by Central Transmission Utility and other related matters) Regulations, 2018

RegulationDated 23 Jul 2018No. L-1/220/2017-CERC dated 23rd July, 2018

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Central Electricity Regulatory Commission's notification of 23 July 2018 makes the CERC (Planning, Coordination and Development of Economic and Efficient Inter-State Transmission System by Central Transmission Utility and other related matters) Regulations, 2018 (p1–2). The preamble anchors the exercise in the Commission's mandate under s.79(1)(c) and (d) of the Electricity Act 2003 and in CTU's functions under s.38(2)(b)–(d), and frames the aim as a transparent, consultative planning process for ISTS and the matching intra-State system (p1).

The regulations take effect from publication in the official gazette, a date not printed (p2). They apply to CTU, STUs, generating companies including captive plants connected or intending to connect to ISTS, transmission and distribution licensees, RPCs, NLDC, RLDCs and SLDCs (p2–3), and are expressly additional to the Transmission Licence Regulations 2009, the 2010 Regulatory Approval Regulations and the tariff regulations issued under s.61 (p3).

Regulations 5–7 divide the work: CTU plans, prepares base cases and runs system studies; NLDC/RLDCs feed operational statistics and analysis; generators supply technical data and project status in CTU's format; RPCs help build the base case, review proposals and monitor the matching intra-State system quarterly (p3–4). Augmentation planning must weigh new and emerging technologies, cost-benefit, retirement of old stations, renewable addition and RPOs, black-start adequacy, reactive power, and power-market or cross-border considerations (p4–5), with RE-specific planning drawing on the Perspective Plan and state RPOs and advance consultation with MNRE and state RE departments (p5). The planning cycle runs at least twice a year, using probabilistic scenarios, seasonal peak/off-peak studies, re-conductoring and compensation options, mid-course correction, website publication of scenarios and schemes for comment, RPC recommendations within two months, and Commission approval where CTU departs from RPC advice or where a scheme is of national or strategic importance (p5–7).

Regulations 8–9 set the transparency regime — half-yearly website disclosure of assumptions, study results, stakeholder comments and their treatment, likely capital cost and estimated monthly tariff — and list what CTU must file for regulatory approval, for a transmission licence recommendation, and what a transmission licensee must file with its tariff application (p7–9). Regulations 10–13 cover record custody, quarterly status reporting, adequate planning manpower with a certification scheme for planning personnel, and the Commission's powers to relax and to remove difficulties (p9–10).

Primary topics
Network planning and investment

Read with this

Commencement notices and reasons

Other copies of these documents (1)

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.