CSERC · Chhattisgarh State Electricity Regulatory Commission
Group Net Metering and Virtual Net Metering for Renewable Energy Guidelines, 2022
Chhattisgarh State Electricity Regulatory Commission (Group Net Metering and Virtual Net Metering for Renewable Energy) Guidelines, 2022
GuidelinesDated 22 Dec 2022No. 96/CSERC/2022 dated 22nd December 2022
Made under the Grid Interactive Distributed Renewable Energy Sources Regulations, 2019.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Chhattisgarh State Electricity Regulatory Commission issued these Guidelines under Regulation 26 of the CSERC (Grid Interactive Distributed Renewable Energy Sources) Regulations, 2019 to operationalise Group Net Metering (GNM) and Virtual Net Metering (VNM) in the State (p6). They take effect from publication in the Official Gazette, but the Gazette date is not printed; the order is dated Raipur, 22 December 2022 (p6).
Clause 2 defines GNM as an arrangement where surplus energy from a Renewable Energy System or BESS charged through renewable energy is exported through a net meter and adjusted across more than one service connection of the same consumer within one distribution licensee's area; VNM exports the entire generation through a renewable-energy or gross meter and adjusts it across more than one participating consumer's connection (p6). An Eligible Consumer is one using a self-owned or third-party solar project to offset own consumption (p6).
Clause 3 makes GNM available to all consumers but limits VNM to residential consumers, group housing societies and Government/Local Authority establishments (p6). The capacity to be installed must be within the range stated as 'not less than 1 kilo Watt and more than 500 kilo Watt' and must not exceed the consumer's sanctioned load or contract demand (p6). Clause 4 caps cumulative distributed renewable capacity at the distribution transformer level (p7). Clauses 5–7 route application, interconnection and metering to the parent DRE Regulations, the Grid Code and the Supply Code, and place the differential cost of a net meter on the consumer (p7).
Clauses 8–9 provide detailed billing and energy-accounting rules. For GNM, surplus units are adjusted against other connections in a consumer-set priority list, which can be revised once a financial year with two months' notice; time-of-day and non-ToD treatment and carry-forward of energy credits within the settlement period are specified (p7). For VNM, credits follow the agreement/MoU procurement ratio, the share can be changed once a financial year with two months' notice, and unadjusted credits of a disconnected consumer are paid at year-end (p8). Clauses 10–15 deal with end-of-year surplus tariff, theft and tampering, dispute resolution, exemption from wheeling, cross-subsidy, transmission and distribution and banking charges, RPO accounting by the distribution licensee, and REC eligibility (p8). Clauses 16–17 give the Commission power to relax and amend the Guidelines (p9).
Read with this
The regulation
Amendments and corrections
6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 corrigendum.
Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.