Grid Interactive Distributed Renewable Energy Sources (First Amendment) Regulations, 2021

Chhattisgarh State Electricity Regulatory Commission (Grid Interactive Distributed Renewable Energy Sources) (First Amendment) Regulations, 202 I

AmendmentDated 27 Dec 2021No. 93/CSERC/2021

Amends the Grid Interactive Distributed Renewable Energy Sources Regulations, 2019.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cserc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Commission's First Amendment to its 2019 Grid Interactive Distributed Renewable Energy Sources (DRE/IDRES) Regulations, made under ss.42, 61, 65 and 86 read with s.181 of the Electricity Act 2003 (p2). It does not reissue the framework; it rewrites a defined set of provisions, clause by clause. It takes effect from publication in the CG Rajpatra.

Clauses 2–4 (p2) replace the interconnection provisions: grid-connection voltage follows the voltage at which the prosumer already receives supply, with a carve-out letting HT net-metering consumers connect at their LT bus bar while metering stays at HT, and the technical benchmark is pinned to the CEA's 2013 distributed-generation connectivity regulations and the CEA safety regulations. Clause 5 (p3) exempts prosumer-supplied meters bearing a valid NABL test certificate from licensee testing.

Clauses 6–9 (p3) govern net metering and eligibility: multiple systems at a single injection point, capacity capped at sanctioned load or contract demand with minimum and maximum system sizes, injected units usable only to offset energy supplied and not other fees and charges, and open interconnection on a first-come-first-serve basis. Clauses 10–12 (p4) set the size floor and ceiling for remotely located IDRES serving captive load or open access, block-level limits for co-located systems, and a substituted definition of the Interconnection Point keyed to the CEA metering regulations.

Clause 13 (p4–5) replaces regulation 21 in full: must-run status, lifetime banking, banking charges in kind, the banking year, time-of-day withdrawal charges, deemed banking from synchronization, licensee purchase of unutilised banked energy at a benchmark bidding-discovered tariff, waivers of cross-subsidy surcharge, SLDC, transmission and wheeling charges within capacity and time limits, and exemption from commercial scheduling and deviation settlement. Clauses 14–16 (p5–6) impose study, reporting and business-model obligations on distribution licensees, including TOD-tariff exploration for demand response. Clause 17 (p6) reconstitutes the advisory committee. Clause 18 (p6) inserts a proviso extending the regulations to plants installed, being installed, or that achieved COD after the Principal Regulations.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Energy banking, Open access

Read with this

Procedures and orders made under it

6 more documents belong here and are not on Voltaic: 5 copies in another language and 1 corrigendum.

Voltaic last read CSERC's website for final documents on 24 Nov 2026 and for drafts on 21 Nov 2026. A document CSERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cserc.gov.in ↗

Report an issue with this document