Skip to content

OERC · Odisha Electricity Regulatory Commission

Odisha Generation Tariff Regulations, 2014

Odisha Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014

RegulationDated 8 Sep 2014Published in the Gazette 10 Oct 2014No. 1251—OERC-RA-AMEND.-REGU.-8/2013(Vol.-I) dated The 8th September 2014

Replaced by Generation Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software, from pages 1 to 27 of 35. Check the regulator's original before you rely on it.

The Odisha Gazette notification (p1) contains the Odisha Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014, made under the Electricity Act, 2003. They extend to the whole State of Odisha, come into force on Gazette publication, and remain in force until 31 March 2019 unless reviewed earlier or extended (p1). Existing PPAs or adopted tariffs approved before notification are preserved to the extent of stated existing installed capacity (p1).

Chapter 1 (p1–7) is preliminary: it sets the application to existing and future generating stations supplying GRIDCO/distribution licensees under long-term agreements, excludes stations under Central Commission jurisdiction and specified renewable stations whose tariff the Commission decides separately, and defines the core cost, availability, commercial-operation, fuel, hydro and accounting terms used throughout (p2–7).

Chapter 2 (p8–10) specifies the tariff-determination procedure: the Commission may act suo motu or on petition, may determine tariff station-wise or unit-wise, may issue provisional tariff, prescribes filing formats and fees, provides an annual filing route for OHPC and OPGC, and sets the truing-up mechanism including refund/recovery of over- or under-recovered amounts with interest (p8–10).

Chapter 3 (p11–14) gives the methodology for capital cost and capital structure: admissible capital cost, prudence check, additional capitalisation before and after the cut-off date, treatment of infirm power revenue, normative 70:30 debt-equity, and renovation and modernisation proposals for life extension (p11–14).

Chapter 4 (p15–26) is the tariff computation chapter. It lists the annual fixed cost components, return on equity, income-tax pass-through, interest on loan, depreciation, interest on working capital and normative O&M expenses (p15–19). It then sets the formulae and conditions for thermal capacity charge and energy charge, including fuel and limestone cost adjustment and transit/handling losses (p20–22); hydro capacity and energy charges, including design-energy shortfall treatment and an ECR ceiling (p22–24); pumped-storage capacity and energy charges, including outage adjustment (p24–26); and treatment of deviations through the CERC Deviation Settlement Mechanism, 2014, with SEM metering by STU and SLDC (p26).

Chapter 5 begins the norms of operation, starting with thermal-station availability, plant load factor and gross station heat rate norms, and allows the Commission to revise station heat rate at its discretion (p27).

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Capital cost and investment

Read with this

Commencement notices and reasons

2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it not held as English text.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document