Skip to content

OERC · Odisha Electricity Regulatory Commission

Generation Tariff Regulations, 2014 — Extension of period of applicability to 31.03.2020

Extension of period of applicability of Odisha Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014

NotificationDated 4 Feb 2020OERC/RA/AMEND. REG. – 14/2013/1233 dated 4.02.2020

Replaced by Generation Tariff Regulations, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Read with the Odisha Generation Tariff Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on orierc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a one-page OERC notification (p1) whose single purpose is to keep the Commission's existing generation-tariff framework alive for one more year. It recites that the OERC (Terms and Conditions for Determination of Generation Tariff) Regulations, 2014 came into force on 08.09.2014 and, under their Regulation 1.4, were to remain in force only till 31.03.2019 — the end of the FY 2018-19 control period (p1).

Because the Commission has begun reviewing those Regulations for the next control period and the revised Regulations will take more time to notify, it uses Regulation 1.4 to extend the 2014 Regulations' applicability by one year, to 31.03.2020, and provides that the parameters fixed for FY 2018-19 also apply to FY 2019-20 (p1). Nothing else is changed. It is a bridge instrument: no new parameters, no new obligations, and the revision that will replace the 2014 Regulations is left to a future notification with no date stated.

Standard name
Generation Tariff Regulations
Primary topics
Generation tariff, Tariff determination

Read with this

The regulation

2 more documents belong here and are not on Voltaic: 1 amendment and 1 procedure or order made under it not held as English text.

Voltaic last read OERC's website for final documents between 24 Nov 2026 and 26 Nov 2026 (9 pages) and for drafts on 21 Nov 2026. A document OERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on orierc.org ↗

Report an issue with this document