Framework for Resource Adequacy Regulations, 2025 — Draft

Himachal Pradesh Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025.

Draft regulationDated 27 Feb 2025No.HPERC/RA/TTE/0225 dated 27.02 . 2025

Draft

A proposal that has since been finalised as the Framework for Resource Adequacy Regulations, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is a draft notification from the Himachal Pradesh Electricity Regulatory Commission, dated 27.02.2025, proposing the HPERC (Framework for Resource Adequacy) Regulations, 2025. The Commission invites objections or suggestions within thirty days of publication of the draft in the Rajpatra, Himachal Pradesh; the draft regulations state that they will come into force from the date of publication in the Official Gazette (pp1–2).

Regulations 1–3 (pp2–5) set the title, commencement, State-wide application and coverage — generating companies, distribution licensees, SLDC, STU, other grid-connected entities and stakeholders — and define the planning vocabulary, including capacity credit, EENS/NENS, LOLP, planning reserve margin and the 10/5/1-year long/medium/short-term planning horizons. Chapter 2 (pp5–6) establishes a four-step framework: demand assessment and forecasting; generation resource planning; procurement planning; and monitoring and compliance, with a ten-year rolling exercise and Long-, Medium- and Short-Term Distribution Resource Adequacy Plans (DRAPs).

Chapter 3 (pp6–11) deals with demand assessment. Distribution licensees must forecast energy by consumer category using specified or justified methods, adjust for losses, determine peak demand, test scenarios, and carry out short-term hourly or sub-hourly forecasting. Forecasts are aggregated through SLDC/STU and sent to CEA/NLDC/RLDC on annual deadlines. Chapter 4 (pp12–20) covers generation resource planning: mapping existing, upcoming and retiring resources; capacity crediting, including a net-load method for RE and separate treatment for hydro and thermal; setting planning reserve margin against reliability indices; identifying the resource gap; preparing DRAPs; using CEA’s LT-NRAP and NLDC’s ST-NRAP; and demonstrating staged capacity tie-up to the Commission. It also indicates preferred contract-tenure shares and excludes day-ahead market purchases from resource adequacy contribution.

Chapter 5 (pp20–25) sets procurement planning: least-cost optimal resource mix, procurement type and tenure, capacity sharing, prior Commission approval for new PPAs/PSAs, and exceptions for additional or emergency procurement. Chapter 6 (p25) makes compliance with resource adequacy requirements binding and leaves non-compliance charges to Commission determination. Chapter 7 (pp25–27) prescribes data maintenance and sharing, plus annual submission timelines for DRAPs and contracted capacity. Chapter 8 (pp27–28) covers website publication of merit-order dispatch, consultation, and the Commission’s powers to issue directions, relax, remove difficulties, amend and depart from procedure. Annexure-I (pp29–31) lists the modelling constraints for the resource adequacy optimisation.

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Competitive bidding

Read with this

The regulation

Commencement notices and reasons

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document