HPERC · Himachal Pradesh Electricity Regulatory Commission
Resource Adequacy Framework Regulations, 2025 — Finalisation Order
Himachal Pradesh Electricity Regulatory Commission (Resource Adequacy Framework)Regulations, 2025
OrderDated 28 Apr 2025
Read with the Framework for Resource Adequacy Regulations, 2025.
Summary
Summary written by software. Check the regulator's original before you rely on it.
An order of the Himachal Pradesh Electricity Regulatory Commission dated 28 April 2025 that closes the consultation on the draft HPERC (Resource Adequacy Framework) Regulations, 2025 and directs that the final Regulations be published in the Rajpatra, coming into force on that publication (p1, p26).
Pages 1–3 give the background and the statutory basis: resource adequacy planning is meant to match generation capacity to projected demand through a judicious mix of long-, medium- and short-term contracts, and the draft was issued under s.181 read with ss.61, 66 and 86 of the Electricity Act, 2003 (p1–2). Pages 2–4 record the consultation chronology — draft notified 27 February 2025, published in the Rajpatra on 3 March 2025, objections invited by 3 April 2025, written submissions from IEX, GNA Energy, HPSEBL and CER/EAL, and a public hearing held on 10 April 2025 (p2–4).
The bulk of the order (pp4–23) is a clause-by-clause statement of reasons: each stakeholder comment on the draft, then the Commission's view and decision. The Commission accepts only one drafting change — a new proviso under Regulation 5.5 requiring the Discom to periodically validate and refine its demand forecasting models and adopt emerging methodologies (p5). It rejects the rest: it keeps the forecasting flexibility in Regulation 5(9) (p6); keeps the capacity credit factor formula in Regulation 8(2)(f) and its top-load-hours basis (p7–8); retains the procurement-mix shares and the first-year/second-year tie-up demonstration in Regulation 10(10) and (15), while adding a proviso to Regulation 10(10) and Regulation 12(3) that power bought through Day-Ahead Market, Real-Time Market and similar short-duration contracts does not count towards resource adequacy (pp9–13); and refuses to admit over-the-counter platforms into short/medium-term procurement, compliance or banking (pp13–21). Regulation 17 (compliance) is retained unchanged (pp22–23).
General suggestions for a state-wide digital platform and for demand response are noted but left out as matters of procedure (pp23–26). Annexure-A at p27 lists the public hearing participants.
Read with this
The regulation
- Dated 28 Apr 2025Framework for Resource Adequacy Regulations, 2025
Earlier drafts
- Dated 27 Feb 2025Framework for Resource Adequacy Regulations, 2025 — Draft
Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.