Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Framework for Resource Adequacy Regulations, 2025

Himachal Pradesh Electricity Regulatory Commission (Framework for Resource Adequacy) Regulations, 2025.

RegulationDated 28 Apr 2025No. HPERC/RA/TTE/0225 dated 28 th April 2025

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is HPERC's principal regulation creating a Resource Adequacy (RA) framework for Himachal Pradesh, notified on 28 April 2025 and taking effect on the date of Gazette publication (p1). It binds the State's distribution licensees as the primary planning entity, with defined roles for the SLDC, STU, generating companies and other grid-connected entities (p1).

Regulations 1–3 set commencement, extent, application, the objective and the defined vocabulary — capacity credit, net load, EENS, NENS, LOLP, planning reserve margin and the three planning horizons: short (one year), medium (five years) and long term (ten years), all on a financial-year basis (p1–4).

Chapter 2 (Reg 4) describes the framework as a four-step cycle — demand assessment and forecasting, generation resource planning, procurement planning, and monitoring and compliance — run on a ten-year annual rolling basis (p4–5). Chapter 3 (Regs 5–6) specifies how licensees build long/medium-term forecasts by consumer category using CEA forecast guidelines and named modelling methods, how they adjust for DSM, open access, EVs, ToD tariffs, agricultural and seasonal factors, how peak demand is derived from energy forecasts, scenario analysis, hourly short-term forecasting, and how SLDC aggregates and escalates State demand forecasts (p5–10).

Chapter 4 (Regs 7–10) is the core: it sets out generation resource planning steps, a net-load-based methodology for computing capacity credits for RE, hydro and thermal resources, the assessment of planning reserve margin against reliability indices, and how licencees compute their resource gap, prepare LT/MT/ST-DRAPs, and reconcile them with CEA's LT-NRAP and NLDC's ST-NRAP, including contract-tenure mix, tie-up demonstration and submission to CEA and the Commission (p10–18).

Chapter 5 (Regs 11–16) governs procurement: least-cost optimal resource mix, contracting route and tenure, capacity sharing, prior Commission approval for PPAs/PSAs, and the exemption cases in which additional short-term procurement may proceed without prior approval (p18–23). Chapter 6 (Reg 17) makes compliance mandatory with non-compliance charges possible; Chapter 7 (Regs 18–19) prescribes the data-sharing protocol and the annual calendar of submissions; Chapter 8 (Regs 20–26) covers merit order publication, consultation, and the Commission's powers to issue directions, relax, remove difficulties, amend, plus a transitional provision preserving the Commission's inherent procedural powers (p23–27). Annexure-I sets out the optimisation constraints the licensee must model — reserve margin, portfolio balance, RE and conventional generation, RPO, storage, spinning reserve and demand response (p28–30).

Standard name
Resource Adequacy Framework
Primary topics
Resource adequacy, Power procurement and PPAs, Demand-side management and demand response

Read with this

Commencement notices and reasons

Earlier drafts

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of HPERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document