Solar Rooftop Net/Gross Metering Regulation, 2023 — First Amendment, 2025 — Statement of Reasons

First Amendment to the Andhra Pradesh Electricity Regulatory Commission (The Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering) Regulation, 2023 (Regulation No. 4 of 2023)

Statement of reasonsDated 4 Dec 2025Published in the Gazette 24 Feb 2024Regulation No.10 of 2025 dated 04.12.2025

The commission's reasons for the Regulation 4 of 2023 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is APERC's combined statement of reasons and order, dated 4 December 2025, adopting the First Amendment (Regulation No. 10 of 2025) to the Andhra Pradesh Electricity Regulatory Commission (Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering) Regulation, 2023 — Regulation No. 4 of 2023 (p1, p17).

The trigger was the Andhra Pradesh Integrated Clean Energy Policy, 2024, released on 16.10.2024, and a direction from the GoAP Energy Department under s.108 of the Electricity Act, 2003 proposing two specific changes to the Principal Regulation (p1). The Commission published a draft and public notice on 26.03.2025, a revised draft on 19.08.2025, extended the comment window to 15.09.2025, and received submissions from 13 stakeholders (p2, p16, p18–19).

Pages 1–15 work clause by clause through the objections and the Commission's decisions. The definitions of Virtual Net Metering and Group Net Metering are rewritten to add a slot-wise Time-of-Day netting hierarchy (peak, then normal, then off-peak) and to treat net export as payable at the Commission-fixed feed-in tariff; distribution/wheeling charges are deducted but waived where injection and withdrawal are at the same voltage, with the DISCOM to claim that waiver from GoAP under s.65 (p2–6, p19–21). A new definition of Distributed Energy Resources Aggregator (DERA) is inserted, and a clause enables DISCOMs to engage aggregators under a commercial agreement for a one-time fee approved by the Commission (p6–9, p21–22). The order sets a graded application fee by capacity band, agreement submission and deemed-approval timelines, a once-a-year right for VNM/GNM consumers to change the consumer list or sharing ratio, and behind-the-meter SRTPVS provisions (p9–12, p23–24). Capacity ceilings in clause 5.6 were retained despite requests to raise them (p12–14). Clause 22 on repeal and savings is rewritten to protect commissioned and under-construction projects and their agreements (p14–15, p24–25).

Annexure-II (pp17–25) is the operative regulation text. Annexure-III (pp26–30) gives worked Time-of-Day settlement illustrations for VNM, GNM and individual net metering. The amendment comes into force on Gazette publication, but the Gazette date is not printed in this document (p19).

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Connection and miscellaneous charges

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗