Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering Regulation, 2023 — Statement of Reasons

APERC (THE GRID INTERACTIVE SOLAR ROOFTOP PHOTOVOLTAIC SYSTEM UNDER GROSS/NET METERING) REGULATION, 2023.

Statement of reasonsDated 22 Feb 2024

The commission's reasons for the Regulation 4 of 2023 or one of its amendments.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on aperc.gov.in ↗

Summary

Summary written by software, from pages 1 to 34 of 132. Check the regulator's original before you rely on it.

This is APERC's clause-by-clause statement of reasons for finalising the APERC (Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering) Regulation, 2023 (Regulation 4 of 2023), dated 22 February 2024 (p1). It records objections and suggestions received on the draft hosted for public comment on 6 June 2023, the Commission's analysis, and revised clause text where changes were accepted (p1–2). It is a reasoning and consultation document, not the full final regulation.

Section 1 (Definitions and Interpretations, p2–12) deals with metering concepts. The Commission retains a bi-directional gross meter definition, rejects retail-tariff payment for net exports, aligns group/virtual/individual net metering titles with MNRE/GoI Rules, confines group and virtual net metering to the same Electricity Revenue Office, permits SRTPVS on open land outside consumer premises for group/virtual net metering, retains third-party investment as captive use, and introduces net billing/net feed-in as a third arrangement with import valued at retail and export at feed-in tariff (p2–15).

Section 2 (General, p12–19) revises application processing, battery storage, disconnection/restoration, islanding protection, and commercial agreement disclosure. Net billing is added to the options DISCOMs must offer; battery charging from DISCOM supply is allowed but billed at DISCOM tariff; disconnection requires rectification notice and restoration within 24 hours; and third-party commercial agreements must be filed with the DISCOM before synchronisation (p13–19). The Commission also proposes a Regulatory Impact Assessment one year after publication (p14).

Section 3 (Eligibility, p19–20) makes all consumers of AP DISCOMs eligible and lets them choose net metering, gross metering, or net billing/net feed-in. Section 4 (Capacity of Rooftop Systems, p20–32) sets minimum and maximum capacities for individual, group, virtual, gross and net-billing frameworks; retains a lower net-metering cap while allowing a higher net-billing cap; fixes a gross-metering cap; provides a revised capacity summary table and voltage-level interconnection table; retains the 80% distribution-transformer hosting limit and 100% feeder limit; and requires DISCOM website disclosure of available capacity (p20–32).

Section 5 (Interconnection with the Grid, p32–33) allows solar rooftop developers, vendors and MNRE channel partners to attend departmental procedures, except signing the agreement. Section 6 (Metering, p33–34) makes consumers bear meter costs, requires DISCOMs to publish meter/metering equipment costs and specifications, allows consumer procurement subject to CEA standards and DISCOM or NABL testing.

Standard name
Net Metering and Rooftop Solar
Primary topics
Net metering, Gross metering, Net billing

Read with this

Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on aperc.gov.in ↗

Report an issue with this document