Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering Regulation, 2023 — Consolidated (First Amendment, 2025; Errata, 2026)
Andhra Pradesh State Electricity Regulatory Commission (The Grid Interactive Solar Rooftop Photovoltaic Systems under Net/Gross Metering ) Regulation, 2023.
Consolidated copyDated 31 Dec 2025REGULATION NO. 4 OF 2023 dated 22.02.2024
A consolidated copy of the Regulation 4 of 2023, published by APERC for reference. It may not include the latest amendments; read it with the amendments listed for the regulation.
Summary
Summary written by software, from pages 1 to 41 of 62. Check the regulator's original before you rely on it.
This is APERC Regulation No. 4 of 2023 — the Grid Interactive Solar Rooftop Photovoltaic System under Gross/Net Metering Regulation, 2023 — presented as a consolidated text with the First Amendment (Regulation No. 10 of 2025, dated 08-12-2025) and an Errata dated 19-01-2026 (p1). It replaces earlier APERC-approved SRTPVS guidelines for new cases and creates a framework for consumers and DISCOMs in Andhra Pradesh to install grid-connected rooftop solar with or without battery storage (p1–3). It comes into force on Gazette publication, but no Gazette date is printed; the regulation itself is dated 22.02.2024 (p3, p23).
The operative regulation (pp3–23) defines prosumers and the available metering options — individual net metering, group net metering, virtual net metering, gross metering and net billing/net feed-in (pp3–8). It sets eligibility for all AP DISCOM consumers, capacity bands by metering type and voltage level, limits on cumulative SRTPVS capacity at distribution transformers and feeders, and DISCOM disclosure duties (pp8–12). It specifies interconnection with CEA and APERC grid standards, metering responsibilities and costs, and a feed-in tariff that applies for 25 years or project life (pp12–14). It governs wheeling/T&D charges and cross-subsidy surcharge treatment, MNRE subsidies, application and technical feasibility procedures and timelines, agreement and commissioning timelines, energy settlement and billing (including ToD and group/virtual netting), and DISCOM capacity targets (pp14–22). It also contains power to relax, issue practice directions, remove difficulties, amend, and a repeal-and-savings clause that protects existing projects and agreements (pp22–23).
The annexures (pp24–41) provide the application format, declarations, deficiency and feasibility formats, and the individual and group/society net-metering/gross-metering agreements.
Read with this
The regulation
- Dated 22 Feb 2024Regulation 4 of 2023
Amendments and corrections
- Dated 4 Jan 2023Regulation No. 1 of 2023
- Dated 27 Aug 2024Licensees Standards of Performance Regulation 2004 — Fifth Amendment, 2024
Commencement notices and reasons
Proposed changes (drafts with no final yet)
Voltaic last read APERC's website for final documents on 24 Nov 2026 (2 pages) and for drafts on 21 Nov 2026. A document APERC issued after the page that lists it was read may not be held by Voltaic yet.