Draft Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Explanatory Memorandum

EXPLANATORY MEMORANDUM ON DRAFT MAHARASHTRA ELECTRICITY REGULATORY COMMISSION (ELECTRICITY SUPPLY CODE AND STANDARDS OF PERFORMANCE OF DISTRIBUTION LICENSEES INCLUDING POWER QUALITY) REGULATIONS, 2020

Explanatory memorandum to a draftDated 8 Dec 2020

Draft

Voltaic holds no final regulation made from this draft.

Explanatory memorandum to the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on merc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is MERC’s explanatory memorandum dated 8 December 2020, issued with the draft MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2020 (p1). It is a consultation document: it explains why the Commission proposes to merge the 2005 Supply Code and the 2014 Standards of Performance Regulations into one Code, and gives the rationale for major changes so stakeholders can respond before final Regulations are issued (p4, p6–8). It is not itself operative.

Section 1 sets out the background: the Section 50 mandate, the 2005 Supply Code, later practice directions, and the need to consolidate and align the framework with newer regulations and with digital and power-quality objectives (p4–7). Section 2 explains the proposed new title, repeal of the 2005 and 2014 Regulations, and savings for actions already taken (p8). Section 3 discusses definitions to be added or revised — including voltage-based consumer classes, contract demand, DDF, temporary supply, metering terms and power-quality terms (p8–14). Section 4 deals with the system of supply, removal of the DC option, special/multiple-source supply, HVDS tapping for agricultural DDF, and load/diversity norms in Annexure I (p14–18).

Sections 5–6 cover connection charges and recovery: EHT network cost and reimbursement, service-line charges, DDF takeover, and temporary-supply safeguards (p18–22). Section 7 sets out the proposed online application process, tracking, compensation for delay, single-point supply for housing societies/company housing, minimal documents and e-KYC, deficiency timelines and release timelines (p22–27). Section 8 covers processing issues such as rising mains, premises dues before new connection, and land/room for distribution transformers (p27–29). Section 9 makes the application form the agreement and addresses termination, final bills and contract-demand regularisation (p29–31). Section 10 covers disconnection where access is refused (p31–32). Section 11 restates theft and unauthorised-use assessment, appeal and preventive measures (p32–35). Section 12 allows disconnection for unsafe internal wiring (p35–36). Section 13 revises security deposit, instalments, pre-paid-meter treatment and refund (p36–38). Section 14 covers smart/remote-reading meters, deletion of meter security, consumer-purchased meters, meter reading/self-reading and testing (p38–42). Section 15 covers billing cycles, bill delivery and content, average billing, due dates, cheque/cash restrictions, advance fixed charges and payment priority (p42–48). Section 16 addresses the statutory limitation on old arrears and premises liability (p48–49). Section 17 treats pre-paid auto cut-off as not being disconnection (p49). Section 18 requires outage notices (p49–50). Section 19 changes schedule-of-charges filing (p50). Section 20 is the power-quality chapter: parameters, standards, PQ meters, central database and reliability indices (p50–54). Section 21 proposes a CRM (p54–55). Section 22 sets compensation, automatic for selected standards, with multipliers and eligibility, and keeps power-quality compensation in abeyance (p55–57). Section 23 requires consumer awareness and performance disclosure (p57–58).

Standard name
Electricity Supply Code, Standards of Performance, Power Quality
Primary topics
Conditions of supply, Standards of performance, Power quality

Read with this

Voltaic holds no final regulation made from this draft.

One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.

Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on merc.gov.in ↗