MERC · Maharashtra Electricity Regulatory Commission
Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Draft
Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2020
Draft regulationReleased with the notice dated 8 Dec 2020MERC/Technical/XXX/2020/
Draft
A proposal, not law. Voltaic holds no final regulation made from this draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a draft MERC regulation that would replace, in one instrument, the Commission's 2005 Supply Code and its 2014 Standards of Performance Regulations. It is made under a long list of Electricity Act 2003 provisions — principally ss.43, 45, 46, 47, 50, 57 and 59 read with s.181(2) — and would bind every distribution licensee in Maharashtra, including deemed licensees, all consumers, persons exempt under s.13, and cases of unauthorised supply or use (p2–3). It comes into force from Gazette notification, and on commencement repeals the 2005 and 2014 Regulations while saving actions already taken under them (pp2–3).
Regulations 2–3 set out roughly ninety definitions — unusually heavy on power-quality vocabulary (flicker severity, voltage dips and swells, TDD/THD, reliability indices) alongside commercial terms such as Contract Demand, DDF, Point of Supply and Designated Consumers — and then lay down the system of supply and voltage-wise classification of installations, with higher contract-demand ceilings for the Mumbai Metropolitan Region and express-feeder supply (pp3–12).
Regulations 4–7 govern money and entry: what a licensee may recover for lines, plant, service lines, dedicated facilities, system augmentation and temporary supply; wheeling, cross-subsidy and additional surcharges; the mandatory online application route with a staged rural transition, deemed acceptance where deficiencies are not flagged in time, the documents an applicant must file, inspection and service position, land or a room for a distribution transformer, and the application form itself operating as the supply agreement (pp12–24).
Regulations 8–14 cover the licensee's property and rights of access to consumer premises, the procedure for theft and unauthorised use (assessment, report, objections, appeal and preventive measures), consumer wiring, change of name, security deposits (amount, annual recalculation, refunds, interest, bank-guarantee option) and classification into Commission-approved tariff categories (pp24–32).
Regulations 15–17 are the metering and billing core: smart-meter rollout for new and replacement connections, installation, reading, testing and defective/lost/burnt meters; billing intervals, mandatory bill contents, estimated and defective-meter billing, payment modes and appropriation order, advance payment, delayed payment charges and time-barred arrears; and restoration of supply including prepayment meters (pp32–46).
Regulations 18–21 deal with outage notification and force-majeure liability, the filing and Commission approval of each licensee's Schedule of Charges, the obligation to align existing terms and conditions of supply within a month of notification, and the duty to publish the Code and Schedule of Charges (pp46–48).
Regulations 22–27 are the power-quality and performance regime: limits on voltage variation, flicker, unbalance, dips, short interruptions and harmonics (several by reference to IS 17036 and IEEE 519-2014), SAIDI/SAIFI/CAIDI reliability indices with automated feeder data, Power Quality Meters for licensees and Designated Consumers, round-the-clock call centres and complaint handling, guaranteed standards of performance, and a compensation mechanism that pays automatically for some failures and on claim for others, escalating by 1.5 times on representation and 2 times if upheld by the Forum or Ombudsman (pp48–60). Regulations 28–31 are the standard orders, relax, amend and remove-difficulties clauses (p60). The annexures carry load and diversity norms, the LT and HT/EHT application forms, the compensation matrix, and the quarterly/annual reporting formats (pp61–78).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Dated 8 Dec 2020Explanatory memorandum: Draft Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Explanatory Memorandum
- Dated 8 Dec 2020Public notice: Draft Electricity Supply Code and Standards of Performance Regulations, 2020 — Public Notice
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.