MERC · Maharashtra Electricity Regulatory Commission
Draft Electricity Supply Code and Standards of Performance Regulations, 2020 — Public Notice
Inviting Comments,suggestions and/or objections on Draft Maharashtra Electricity Regulatory Commission (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2020
Public notice on a draftDated 8 Dec 2020Advertisement No. 20/2020-21 dated 08 December, 2020
Draft
Voltaic holds no final regulation made from this draft.
Public notice on the Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Draft.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is a single-page public notice by the Maharashtra Electricity Regulatory Commission announcing that it has prepared a draft of the MERC (Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality) Regulations, 2020, and inviting written comments, suggestions and objections on it (p1).
The draft is described as one that would supersede two existing instruments — the MERC (Electricity Supply Code and Other Conditions of Supply) Regulations, 2005 and the MERC (Standards of Performance of Distribution Licensees, Period for Giving Supply and Determination of Compensation) Regulations, 2014, as amended from time to time — so the notice is the entry point to a consolidation of supply-code and service-standard rules for Maharashtra's distribution licensees (p1).
The draft, in English and Marathi, is stated to be on the Commission's website together with an Explanatory Memorandum (p1). Stakeholders are asked to file comments in 2(1+1) copies with the Secretary, MERC, in person, by post, fax or e-mail; submissions received on or before Tuesday 29 December 2020 will be considered before the Regulations are finalised (p1). The notice is dated 8 December 2020 (p1).
Read with this
Voltaic holds no final regulation made from this draft.
Proposed changes (drafts with no final yet)
- Released with the notice dated 8 Dec 2020Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Draft
- Dated 8 Dec 2020Explanatory memorandum: Draft Electricity Supply Code and Standards of Performance of Distribution Licensees including Power Quality Regulations, 2020 — Explanatory Memorandum
One more document belongs here and is not on Voltaic: a draft or notice on a draft not held as English text.
Voltaic last read MERC's website for final documents on 24 Nov 2026 (8 pages) and for drafts on 24 Nov 2026. A document MERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.