RERC · Rajasthan Electricity Regulatory Commission
Terms and Conditions for Determination of Tariff for Renewable Energy Sources – Biomass, Biogas and Biomass Gasifier Energy Regulations, 2015
Rajasthan Electricity Regulatory Commission (Terms and Conditions for Determination of Tariff for Renewable Energy Sources – Biomass, Biogas and Biomass Gasifier Energy) Regulations, 2015
RegulationDated 7 May 2015In force from 1 Apr 2015RERC/Secy/ Reg. 113 dated 7th May, 2015
Replaced by Terms and Conditions for Tariff Determination from Renewable Energy Sources Regulations, 2020
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Rajasthan Electricity Regulatory Commission issued these regulations on 7 May 2015 (p1) to fix how it will determine generic tariffs for grid-connected biomass (Rankine cycle), biogas and biomass gasifier power plants in the State. They govern tariff determination from FY 2015-16 to FY 2018-19 (p1) and stay in force for four years from commencement unless reviewed or extended (p1).
Part I (p1–4) gives the title, extent and commencement, defines the core vocabulary, confines the regulations to generic tariff determination under s.62 read with s.86, preserves tariffs discovered through s.63 bidding, and lays down eligibility: new plant and machinery, grid connection, MNRE-approved technology, and a cap on fossil fuel use in biomass plants.
Part II (p4–6) fixes the four-year control period and a twenty-year tariff period, routes proceedings through the RERC (Transaction of Business) Regulations 2005, prescribes a two-part tariff of fixed cost and fuel cost, requires levellised tariff design with a discount factor equal to post-tax weighted average cost of capital, and treats these plants as 'must run' outside merit order despatch.
Part III (p6–10) is the financial engine: capital cost basis, debt-equity, loan tenure and base-rate-linked interest, depreciation, return on equity grossed up for MAT, working capital, O&M escalation, rebate slabs, late payment surcharge, CDM benefit sharing, and treatment of government subsidy and accelerated depreciation.
The technology chapters (p10–16) set per-technology norms — capital cost, PLF, auxiliary consumption, station heat rate or specific fuel consumption, calorific value, O&M and fuel or feedstock price — plus the variable-charge formula. Part VII 'Others' (p16–20) carries the tariff table for older plants under the 1999 State policy, the route for switching out of the REC mechanism, grid connectivity charges and injection limits, metering points, kVArh and import charges, transmission and wheeling charges, SLDC fees, the cross-subsidy surcharge exemption and banking rules. Part VIII 'Miscellaneous' (p20–21) gives the Commission powers to deviate, amend and remove difficulties. Annexures I–III (p22–24) list abbreviations and set out the capital cost and fuel price indexation formulae.
Read with this
Amendments and corrections
Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.