Skip to content

CERC · Central Electricity Regulatory Commission

Power System Development Fund Regulations, 2010

Central Electricity Regulatory Commission (Power System Development Fund) Regulations, 2010

RegulationDated 4 Jun 2010No. L-7/14/2010/CERC dated 4th June , 2010

Replaced by Power System Development Fund Regulations, 2014

See that regulation for the date it took effect and for anything it keeps in force.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done or any action taken or purported to have been done or taken including any procedure, minutes, annual reports, confirmation or declaration or any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This notification creates the Power System Development Fund (PSDF) and the machinery for running it. Made by CERC under s.178(1) and s.178(2)(ze) of the Electricity Act, 2003, it comes into force from the date of publication in the Official Gazette (the Gazette date is not printed in the text) (p1).

Regulation 2 defines the terms the rest of the instrument leans on — Congestion Amount, Congestion Charge, Reactive energy charges and Unscheduled Interchange charges are all defined by reference to other CERC regulations rather than freshly defined here (p1–2).

Regulation 3 constitutes the Fund and specifies its sources: residual congestion charges, congestion amount arising from market splitting in power exchanges, residual unscheduled interchange charges, RLDC reactive energy charges, and such other charges as the Commission may notify. It requires separate accounts per source, monthly transfer by collecting agencies, and a proviso sweeping in amounts (plus interest) already lying with the Central Transmission Utility up to 30 April 2010 (p2–4).

Regulations 4 to 6 set the spending side: utilisation as permitted under the relevant regulations, disbursement only after Commission approval, and a Managing Committee procedure for identifying, scrutinising and prioritising projects when the Fund is short of resources; CEA, RPCs, generating companies, transmission licensees, LDCs and power exchanges are to furnish project details (p4–5).

Regulations 7 to 14 build the governance: composition of the Managing Committee (chaired by the NLDC head, with RPC, RLDC, member-convenor and two independent external members, plus a Secretary and Treasurer from NLDC); tenure and resignation; removal grounds; meetings, notice periods, quorum and voting (p5–10). Regulations 15 to 19 cover the Committee's functions — bank accounts, scrutiny and recommendation of proposals, concurrent monitoring, withholding of funds, consultants, TA/DA — plus operation of accounts, vesting of property, a bar on any profit distribution, annual audit by a chartered accountant, and annual and quarterly reporting (p10–12).

Regulations 20 and 21 allow the Commission to dissolve and reconstitute the Fund by Gazette notification in the public interest, and give it a general power to remove difficulties by order (p12–13).

Primary topics
Commission accounts and funds, Advisory committees

Read with this

Commencement notices and reasons

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document