Skip to content

HPERC · Himachal Pradesh Electricity Regulatory Commission

Consumer Grievances Redressal Forum and Ombudsman (Second Amendment) Regulations, 2021 — Draft

Himachal Pradesh Electricity Regulatory Commission (Consumer Grievances Redressal Forum and Ombudsman) (Second Amendment) Regulations, 2021

Draft amendmentDated 24 Nov 2021HPERC-(H)(1)-1/2012 dated 24th November, 2021

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on hperc.org ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

On 24 November 2021 the Himachal Pradesh Electricity Regulatory Commission published, for objections, a draft Second Amendment to its Consumer Grievances Redressal Forum (CGRF) and Ombudsman Regulations, 2013 — the 2013 Regulations having already been amended by a notification gazetted on 28 November 2019 (p1). The stated aim is to serve smaller consumers better, whose disputes are usually of smaller value and whose supply problems are mostly local distribution issues (p1). The draft is published under rule 3 of the Electricity (Procedure for Previous Publication) Rules, 2005; objections and suggestions must reach the Secretary within thirty days of gazette publication of the notification, and the parent regulations and draft are also to be available on the Commission's website (p1).

The draft has sixteen clauses (pp2–8). Clauses 1–3 deal with commencement and with definitions: the definition of "Forum" is substituted and a new definition of "Prosumer" inserted into Regulation 3 (p2), and Regulation 5 is rewritten so that the distribution licensee may establish additional Forums by order, with the Commission empowered to direct locations and define or modify jurisdiction (pp2–3). The first proviso to Regulation 5(2) sets out, per operation circle, what each additional Forum can hear by retail-tariff category, with monetary and voltage conditions for two-part tariff consumers; complaints outside that jurisdiction stay with the principal Forum (p3).

Clauses 4–8 cover the headquarters and sittings of Forums (p4), the ex-officio designation of serving officers as Members and Chairpersons of additional Forums with rank, seniority and eligibility rules and a seven-day reporting duty to the Commission (pp4–5), Chairperson status and the ex-officio Secretary (p6). Clauses 9–16 are procedural and consumer-facing: a web-portal/mobile-app complaint link with online tracking, wider filing channels and references to the "relevant Forum" (p7), changes to order content and publication and to a percentage figure in Regulation 26, longer time limits in Regulations 27 and 37 (pp7–8), and wording changes in Regulations 29 and 38 on standards (p8).

Standard name
CGRF and Ombudsman
Primary topics
Consumer grievance redressal (CGRF)

Read with this

Procedures and orders made under it

Voltaic last read HPERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document HPERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on hperc.org ↗

Report an issue with this document