Skip to content

RERC · Rajasthan Electricity Regulatory Commission

Rajasthan Electricity Grid Code (1st Amendment) Regulations, 2011

Rajasthan Electricity Regulatory Commission (Rajasthan Electricity Grid Code) (1st Amendment) Regulations, 2011

AmendmentDated 10 Jun 2011No.RERC/Secy/Reg. 88 dated 10th, June 2011

Replaced by Rajasthan Electricity Grid Code, 2024

See that regulation for the date it took effect and for anything it keeps in force.

Amends the Rajasthan Electricity Grid Code, 2008.

Saving clause of the regulation that replaces it: “Notwithstanding such repeal, anything done, or any action taken or purported to have been done or taken including any procedure, minutes, reports, confirmation or declaration of any instrument executed under the repealed regulations shall be deemed to have been done or taken under the relevant provisions of these regulations.”

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on rerc.rajasthan.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the First Amendment to the Rajasthan Electricity Grid Code, issued by the Rajasthan Electricity Regulatory Commission on 10 June 2011 and expressed to come into force from the date of publication in the State Gazette (p1). It is not a consolidated code; it rewrites selected chapters of the principal Grid Code, covering definitions, SLDC responsibilities, grid-operation standards, scheduling and protection.

Regulation 2 removes the transitional line that had kept Part II of the earlier Grid Code applicable where not inconsistent with IEGC (p1). Regulation 3 deletes the Bulk Power Transmission Agreement and Operating Coordination Committee definitions and inserts definitions of Gaming, Time Block and Unscheduled Interchange (p1). Regulation 4 substitutes the SLDC responsibility clause, setting out SLDC's role as the state's apex grid operator, its scheduling/despatch, metering, UI-account, outage-planning and open-access facilitation duties, a three-stage open-access grievance route through SLDC, SPC and the Commission, and a non-compliance/derogation regime with penalties, disconnection and reporting (pp1–3). Regulation 5 adds a 765 kV S/C line outage to Chapter V (p3).

Regulation 6 amends Chapter VI's frequency band, voltage operating limits by kV class, harmonic and voltage-unbalance limits, and 765 kV references, with phased compliance deadlines (pp3–4). Regulation 7 substitutes governor-operation provisions for specified thermal and hydro units, restricted governor mode, frequency-response and droop rules, exemptions for gas/CCPP, wind, solar and nuclear, must-run and curtailment treatment for solar/wind, revised frequency thresholds, sudden-output-change limits, protection sub-committee references, and under-frequency/df/dt relay and load-group duties (pp4–6).

Page 6 opens mid-sentence on renewable evacuation-network planning and seasonal outage scheduling; the heading for that amendment is missing. Regulation 9 adds demand-estimation and deviation-regulation duties (p6). Regulation 10 rewrites Chapter X on scheduling, despatch and accounting, including 15-minute block declarations, day-ahead schedules, power-exchange coordination, load/reactive-power management and UI/gaming settlement linked to RERC ABT 2006, RERC Open Access 2004 and CERC UI Regulations 2009 (pp6–7). Regulations 11 and 12 adjust Chapter XI's frequency band and Chapter XV's protection/fault-clearance table and 765 kV references (pp7–8).

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Power quality

Read with this

The regulation

Voltaic last read RERC's website for final documents on 24 Nov 2026. A document RERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on rerc.rajasthan.gov.in ↗

Report an issue with this document