CERC · Central Electricity Regulatory Commission
Standards of Performance of inter-State Transmission Licensees Regulations, 2012
Central Electricity Regulatory Commission (Standards of Performance of inter-State transmission licensees) Regulations, 2012
RegulationDated 17 Sep 2012No.L-1/67/2012-CERC dated 17th September, 2012
Summary
Summary written by software. Check the regulator's original before you rely on it.
A principal CERC regulation of 2012 setting the service standards that inter-State transmission licensees must meet and creating a compensation route for users harmed when those standards are breached. It is issued under s.57(1) read with s.178(2)(p) of the Electricity Act 2003 and takes effect from Gazette publication, though the Gazette date is not printed (p1). Chapter 1 gives the title, commencement, scope — all inter-State transmission licensees — and the working definitions (p1–2).
Chapter 2 is the operative core (p2–4). Regulation 4 states the objective: compliance with the standards and an efficient, reliable, coordinated and economical transmission system, non-adherence entitling affected parties to compensation. Regulation 5 sets two families of norms — element-wise monthly availability floors for AC lines, ICTs, reactors, static VAR compensators, series compensators and HVDC, to be calculated in the manner of the CERC Tariff Regulations 2009 with deemed availability for outages, and maximum restoration times for each type of failure, graded by terrain. Monthly availability must be certified by the Member Secretary of the Regional Power Committee, and tower collapse and ICT/reactor failure are excluded from the availability computation (p3–4). Regulation 6 makes a licensee liable to compensate an affected person without prejudice to penalty or prosecution; regulation 7 sets the procedure, the cap at the transmission charges of the affected element, a bar on recovering compensation through tariff, and a ninety-day limitation on claims (p4).
Chapter 3 requires licensees to report achieved performance and compensation data to the Commission twice a year in the Schedule formats and to publish monthly performance on their websites (p5). Chapter 4 lets the Commission relax norms for force majeure and remove difficulties (p5–6). The Schedule (p7–11) holds five reporting formats, including POSOCO-computed dependability, security and reliability indices.
Read with this
Commencement notices and reasons
Other copies of these documents (1)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of CERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.