CERC · Central Electricity Regulatory Commission
Standards of Performance of inter-State transmission licensees Regulations, 2012 — Statement of Reasons
Statement of Reasons – Standards of Performance of inter-State transmission licensees Regulations, 2012
Statement of reasonsDate not stated
The commission's reasons for the Standards of Performance of inter-State Transmission Licensees Regulations, 2012.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is CERC's Statement of Reasons for the CERC (Standards of Performance of inter-State transmission licensees) Regulations, 2012. It is not the regulation: it records the comments received on the 2010 draft, the Commission's reasoning, and the changes carried into the final text, quoting final wording only for the provisions actually modified (p1).
Section 1 sets out the consultation history — draft published with a public notice of 28.9.2010, comment period extended to 29.10.2010, 11 stakeholders responding in writing, and an open hearing on 11.11.2010 (p1).
Section 2 is the longest and most useful. It rejects Powergrid's argument that section 57 of the Electricity Act does not reach transmission licensees, holding that standards of performance apply to any licensee (p2). It distinguishes these standards — element-wise minimum availability and maximum restoration time, with compensation to the affected user — from the system-level availability incentive/penalty (TAFM/NATAF) in the CERC (Terms and Conditions of Tariff) Regulations, 2009 (p3, p15). It declines to fix protective-relay reliability indices benchmarked to the CBIP manual at this stage, instead inserting a Schedule item requiring licensees to send data to POSOCO and POSOCO to compute and submit indices (p4), and adds a duty to publish and report elements tripping repeatedly in a month (p5). It settles who certifies availability — the Member Secretary of the RPC (p6).
Section 3 redrafts 'affected person' and adds 'user', aligned with the Designated ISTS Customer under the Sharing Regulations 2010, keeping trading licensees and power exchanges out (p9). Section 4 works through Regulation 5: retention of monthly, element-wise availability (rejecting both higher and lower figures and six-monthly/annual averaging), deletion of 'sub-station bay' in favour of ICTs and reactors, exclusion of tower collapse and of ICT/reactor failure from their own availability counts, and a terrain-wise restoration-time table for line, ICT and reactor failures (p10–19). Section 5 explains the compensation design — capped at the transmission charges of the affected element, not a pass-through on cost-plus tariff, claim period extended from 60 to 90 days (p19–21). Sections 6 to 9 cover reporting periodicity, the retained power to relax and to remove difficulties, the Schedule formats, and the rejection of a PIO disclosure requirement (p21–22). The Annexure lists the stakeholders (p23).
Read with this
The regulation
Other copies of these documents (1)
Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.