Skip to content

DERC · Delhi Electricity Regulatory Commission

Business Plan Regulations, 2023

Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2023

RegulationDated 29 Mar 2023In force from 1 Apr 2023F.3(679)/Tariff/DERC/2022-23/7460

1 amendment to it is on Voltaic, dated 30 Apr 2026.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission (Business Plan) Regulations, 2023 are a control-period instrument notified by DERC under Section 181 read with Sections 61 and 86(1)(b) of the Electricity Act, 2003 (p2). They apply from 1 April 2023 to the whole National Capital Territory of Delhi and remain in force for the three-year control period FY 2023-24 to FY 2025-26, unless reviewed earlier; the Commission may extend their validity and the operational norms (p2). Definitions and interpretation are drawn from the DERC (Terms and Conditions for Determination of Tariff) Regulations, 2017 and the Electricity Act (p2).

Part 2 (p3–7) sets the business plan for generating entities: return on equity on a post-tax base, tax gross-up, the margin over SBI MCLR for interest on loans, normative O&M expenses, a tentative capital investment plan, and norms for plant availability/load factor, gross station heat rate and auxiliary consumption. It also specifies generation incentives, a sharing mechanism for gains on controllable heat-rate and auxiliary-consumption parameters, and sharing of refinancing benefits (p6–7).

Part 3 (p8–11) mirrors much of that for the transmission licensee: return on equity, tax gross-up, interest margin, normative O&M, tentative capital investment, NATAF and the monthly transmission-charge formula, and refinancing-benefit sharing. Appendices I–III (p27–30) provide the detailed monthly transmission-availability methodology and the surge-impedance-loading table used for weighting transmission elements.

Part 4 (p12–25) is the distribution business plan. It fixes return on equity for wheeling and retail supply as a whole, carrying cost for regulatory assets/revenue gaps, tax gross-up, interest margin, O&M norms and auxiliary-consumption treatment, and capital investment plans for BRPL, BYPL, TPDDL and NDMC, with true-up rules for capitalization variations. It sets distribution-loss and collection-efficiency targets and their financial-sharing consequences, RPO/HPO targets and compliance/penalty rules, a contingency limit for DSM/UI sales, sharing of surplus-power sale incentives, the PPAC recovery mechanism, refinancing-benefit sharing, the ARR allocation between wheeling and retail supply, revenue-gap treatment, and a provision for ToD tariff time slots by separate order (p17–25).

Part 5 (p26) contains miscellaneous provisions on orders and practice directions, removal of difficulties, relaxation, interpretation, saving of the Commission's inherent powers, conduct of enquiries under the DERC Comprehensive (Conduct of Business) Regulations, 2001, and amendment powers.

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, Capital cost and investment

Read with this

Amendments and corrections

Commencement notices and reasons

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

As of its reading of DERC's website on 24 Nov 2026, Voltaic holds no later regulation that replaces this one.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document