TNERC · Tamil Nadu Electricity Regulatory Commission
Grid Interactive Solar PV Energy Generating Systems (GISS) Regulations, 2021
Tamil Nadu Eleclricity Regulatory Commission (Grid lnteractive Solar PV Energy Generating Systems) (GISS) Regulations, 2021
RegulationDated 7 Oct 2021Published in the Gazette 20 Oct 2021INERCIG/SS Regn.23-1 dated 07. 1 0.20211
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Tamil Nadu Electricity Regulatory Commission (Grid Interactive Solar PV Energy Generating Systems) (GISS) Regulations, 2021, notified by TNERC on 7 October 2021 and published in the Tamil Nadu Government Gazette on 20 October 2021, create the framework for connecting small solar PV systems to the distribution grid in Tamil Nadu (p1–2). They apply across the State to loads below 1 MW and to eligible consumers, prosumers and generators, and come into force from Gazette publication (p2). The regulations define the key commercial and technical terms — net metering, net billing/net feed-in, gross metering, prosumer, eligible consumer, settlement period, network charges and others (p2–4).
Clause 4 and the metering clauses set out who may choose which mechanism. Domestic consumers can net-meter up to their sanctioned load, with an option to move to net feed-in; most other consumer categories except Hut and Agriculture can use net billing/net feed-in up to the lower of sanctioned load/demand or 999 kW; gross metering is for non-LT consumers above 150 kW and for generators selling their entire output, with a 151–999 kW size band (p4–5). Clause 5 prescribes the metering arrangements — bidirectional meters for net arrangements, separate renewable energy generation meters for gross metering, ToD registers, and check meters above 20 kW (p5–6, p10). Clauses 6–7 cover billing and accounting, including carry-forward and lapse at settlement, feed-in credit for gross metering, treatment of excess demand as inadvertent injection, network-charge applicability, and technical limits such as 90% of distribution transformer capacity for net arrangements and 70% of power transformer capacity for gross metering, with first-come, first-served allocation (p6–8).
Clauses 8–9 specify interconnection, protection, anti-islanding, disconnection and metering infrastructure standards, keyed to CEA regulations and the State grid and supply codes (p8–10). Clauses 10–14 deal with network/wheeling charges, general conditions and reporting, energy accounting during meter defects, RPO treatment of solar generation, and REC eligibility (p10–11). Clause 15 lays down the web-based application and registration procedure, registration fees, feasibility and commissioning timelines (p11–13); clauses 16–17 cover access, disconnection and a 25-year connection agreement (p13–14). Clauses 18–21 give the Commission powers to issue directions, relax, amend and remove difficulties (p14). The Explanatory Statement (p15) and two forms — Form 1 application and acknowledgment (p15–16) and Form 2 model connection agreement (p17–19) — complete the instrument. Page 20 carries an unrelated loss-of-certificates notice.
Read with this
Proposed changes (drafts with no final yet)
Earlier drafts
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
As of its reading of TNERC's website on 29 Sep 2026, Voltaic holds no later regulation that replaces this one.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.