Summary written by software. Check the regulator's original before you rely on it.
These are the Delhi Electricity Regulatory Commission’s 2011 regulations for determining intra-state transmission tariffs over the 2012–15 control period (p2–3). They apply to transmission tariff determinations under Section 62 of the Electricity Act, 2003, and expressly do not apply where tariff has been discovered through competitive bidding under Section 63 (p6). They bind the Transmission Licensee and its beneficiaries — long-term, medium-term and short-term transmission customers, with distribution licensees required to be long-term customers — and extend to the whole of NCT Delhi (p2–5).
Part A2 defines the core concepts, including ARR, availability, beneficiaries, control period, COD, transmission customer classes and useful life (p2–6). Part A3 sets the scope and Part A4 establishes a multi-year tariff framework: business plan, baseline, capital investment plan, renovation and modernisation, controllable parameters and truing up (p6–9).
Part A5 is the ARR methodology. It covers segregation of transmission and SLDC accounts, operational norms including target availability, O&M expenses, return on capital employed through a regulated rate base and WACC, depreciation, tax treatment, non-tariff income, other-business income, late payment surcharge, rebate, quality-of-supply monitoring and safety standards (p9–18). Part A6 sets tariff principles: SLDC charges, the annual transmission service charge formula, allocation among long/medium/short-term users and open-access sharing (p18–20). Part A7 specifies the business plan and tariff filing procedure and provisional billing (p20–22). Parts A8–A10 cover disposal of applications, periodic reviews, and miscellaneous powers including directions, removal of difficulties, relaxation, interpretation and amendment (p23–25). Appendices I–III give the depreciation schedule, project completion timelines and the monthly availability-factor calculation (p26–31).
Read with this
The regulation
- Dated 27 Feb 2011Transmission Tariff Regulations, 2011
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2012File: Concept Note on MYT Regulations for FY 2012-13 to FY 2014-15
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.