DERC · Delhi Electricity Regulatory Commission
Transmission Tariff Regulations, 2011
Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Transmission Tariff) Regulations, 2011
RegulationDated 27 Feb 2011In force from 1 Apr 2012
Replaced by Terms and Conditions for Determination of Tariff Regulations, 2017
See that regulation for the date it took effect and for anything it keeps in force.
Summary
Summary written by software. Check the regulator's original before you rely on it.
This is the Delhi Electricity Regulatory Commission's principal regulation for setting transmission tariffs on a multi-year basis for the first control period FY2012-15. It was issued in December 2011 (p2) and comes into force on 1 April 2012, extending to the whole of NCT Delhi (p3). It remains in force for three years unless reviewed earlier or extended (p3).
A1 states short title and extent; A2 defines the framework's vocabulary — licensee, beneficiary, long-term/medium-term/short-term customers by contract duration, transmission system (above 66 kV EHV and associated assets), availability, useful life, change in law, control period, cut-off date and commercial operation (p3-7). A3 confines the regulation to Section 62 tariff determinations and excludes tariffs discovered through Section 63 competitive bidding (p7).
A4 establishes the MYT approach: Commission approves a business plan, baseline values, capital investment plan (scheme-wise, aligned with CEA/CTU/STU plans), renovation and modernisation proposals, and targets for controllable parameters (availability, O&M, RoCE, depreciation). It sets truing-up rules, leaving O&M and working capital variances to the licensee and permitting limited interest-rate pass-through (p7-10).
A5 specifies the ARR for the transmission business: O&M (with formula and indexation), RoCE via a regulated rate base and WACC, depreciation (straight-line, useful life, residual value, no subsidy-funded depreciation), income tax, non-tariff income and other-business income. It also sets operational norms — including the target NATAF for full annual transmission charge recovery with pro-rata recovery below it — and quality-of-supply and safety obligations (p10-18).
A6 covers tariff design: separation of transmission and SLDC accounts; recovery of ARR through transmission tariff; reactive energy and SLDC charges; monthly annual transmission service charge formula and sharing among long/medium/short-term customers; treatment of unallocated plant capacity and short-term open access receipts; and the truing-up mechanism, including use of a regulatory asset and carry-forward into the next control period (p19-21).
A7 sets the filing procedure: business plan filing, tariff application timelines, provisional billing at the pre-control-period tariff until approval, annual performance review, refund/recovery of over- or under-recovery with interest, and end-of-control-period review (p21-24). A8 requires the Commission to dispose of applications within 120 days with targets and approved ARR; A9 provides for periodic reviews; A10 covers CDM benefit sharing, foreign exchange hedging recovery, and the Commission's powers to issue practice directions, relax provisions, remove difficulties and amend (p24-27).
Appendix-I gives the depreciation schedule by asset class (p28-30). Appendix-II gives the procedure and formula for calculating monthly transmission system availability and treats certain outages as deemed available or excluded (p31-32).
Read with this
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2012Transmission Tariff Regulations, 2011
- Dated 1 Jan 2012File: Concept Note on MYT Regulations for FY 2012-13 to FY 2014-15
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.