Skip to content

DERC · Delhi Electricity Regulatory Commission

Concept Note on MYT Regulations for FY 2012-13 to FY 2014-15

Concept Note on MYT Regulations

Published with a draftDated 1 Jan 2012

Draft

Voltaic holds no final regulation made from this draft.

Published with the draft Wheeling and Retail Supply Tariff Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission's Concept Note, dated September 2011, is a consultation document explaining the Draft MYT Regulations for the second multi-year tariff Control Period. It recalls the statutory setting under the Electricity Act 2003, the Delhi Electricity Reform Act and the first MYT Regulations, and proposes a three-year Control Period running from FY 2012-13 to FY 2014-15 for generation, transmission, distribution and retail supply (p5–6). It states the MYT objectives — regulatory certainty, financial viability, incentives for efficiency and a controllable/uncontrollable risk-sharing framework (p6).

The note sets out the process at the start of the Control Period: target-setting for controllable parameters, including system losses, operating costs, capital investments, financing costs and quality parameters (p6–8). It then describes annual filings for capital expenditure, revenue requirement and tariffs, correction factors for uncontrollable items, and the end-of-period review and truing-up (p8–10).

For wheeling and retail supply it covers sales projections and sales-variation treatment, AT&C loss definition and measurement issues, open-access surcharges, power procurement planning and rebates, O&M expenses, working capital, return on capital employed, depreciation, income tax, non-tariff income, other-business income, voltage-wise wheeling charges and retail tariff design (p11–26). For transmission it addresses availability norms, ARR components, O&M, working capital, RoCE, depreciation, income tax, non-tariff and other income, aligning with CERC 2009-14 (p27–33).

For generation it lists the IPGCL and PPCL stations, retains existing operating norms but shifts incentives to normative plant availability, and proposes changes to capital cost, additional capitalisation, infirm power, debt-equity, renovation and modernisation, interest and finance charges, working capital, depreciation, return on equity, income tax, O&M, secondary fuel oil expenses and generation incentives (p34–48). A final benchmarking section explains inputs, outputs, comparators and a staged process for comparing distribution licensees and setting targets (p49–50).

Standard name
Multi Year Tariff Regulations
Primary topics
Multi Year Tariff (MYT), Tariff determination, ARR and true-up

Read with this

Read with this: Wheeling and Retail Supply Tariff Regulations, 2011

The regulation

Proposed changes (drafts with no final yet)

It is also read with: Generation Tariff Regulations, 2011

Draft · Published with the draft Generation Tariff Regulations, 2011. Voltaic holds no final regulation made from this draft.

The regulation

Earlier drafts

It is also read with: Transmission Tariff Regulations, 2011

Draft · Published with the draft Transmission Tariff Regulations, 2011. Voltaic holds no final regulation made from this draft.

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document