DERC · Delhi Electricity Regulatory Commission
Concept Note on MYT Regulations for FY 2012-13 to FY 2014-15
Concept Note on MYT Regulations
Published with a draftDated 1 Jan 2012
Draft
Voltaic holds no final regulation made from this draft.
Published with the draft Wheeling and Retail Supply Tariff Regulations, 2011.
Summary
Summary written by software. Check the regulator's original before you rely on it.
The Delhi Electricity Regulatory Commission's Concept Note, dated September 2011, is a consultation document explaining the Draft MYT Regulations for the second multi-year tariff Control Period. It recalls the statutory setting under the Electricity Act 2003, the Delhi Electricity Reform Act and the first MYT Regulations, and proposes a three-year Control Period running from FY 2012-13 to FY 2014-15 for generation, transmission, distribution and retail supply (p5–6). It states the MYT objectives — regulatory certainty, financial viability, incentives for efficiency and a controllable/uncontrollable risk-sharing framework (p6).
The note sets out the process at the start of the Control Period: target-setting for controllable parameters, including system losses, operating costs, capital investments, financing costs and quality parameters (p6–8). It then describes annual filings for capital expenditure, revenue requirement and tariffs, correction factors for uncontrollable items, and the end-of-period review and truing-up (p8–10).
For wheeling and retail supply it covers sales projections and sales-variation treatment, AT&C loss definition and measurement issues, open-access surcharges, power procurement planning and rebates, O&M expenses, working capital, return on capital employed, depreciation, income tax, non-tariff income, other-business income, voltage-wise wheeling charges and retail tariff design (p11–26). For transmission it addresses availability norms, ARR components, O&M, working capital, RoCE, depreciation, income tax, non-tariff and other income, aligning with CERC 2009-14 (p27–33).
For generation it lists the IPGCL and PPCL stations, retains existing operating norms but shifts incentives to normative plant availability, and proposes changes to capital cost, additional capitalisation, infirm power, debt-equity, renovation and modernisation, interest and finance charges, working capital, depreciation, return on equity, income tax, O&M, secondary fuel oil expenses and generation incentives (p34–48). A final benchmarking section explains inputs, outputs, comparators and a staged process for comparing distribution licensees and setting targets (p49–50).
Read with this
Read with this: Wheeling and Retail Supply Tariff Regulations, 2011
The regulation
- Dated 27 Feb 2011Wheeling and Retail Supply Tariff Regulations, 2011
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2012Draft Wheeling and Retail Supply Tariff Regulations, 2011
It is also read with: Generation Tariff Regulations, 2011
Draft · Published with the draft Generation Tariff Regulations, 2011. Voltaic holds no final regulation made from this draft.
The regulation
- Dated 19 Jan 2012Generation Tariff Regulations, 2011
Earlier drafts
- Dated 1 Jan 2012Generation Tariff Regulations, 2011
It is also read with: Transmission Tariff Regulations, 2011
Draft · Published with the draft Transmission Tariff Regulations, 2011. Voltaic holds no final regulation made from this draft.
The regulation
- Dated 27 Feb 2011Transmission Tariff Regulations, 2011
Proposed changes (drafts with no final yet)
- Dated 1 Jan 2012Transmission Tariff Regulations, 2011
Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.