DERC · Delhi Electricity Regulatory Commission

Generation Tariff Regulations, 2011

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2011

Draft regulationDated 1 Jan 2012

Draft

A proposal that has since been finalised as the Generation Tariff Regulations, 2011.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

The Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2011 is a principal DERC regulation issued in September 2011 for determining generation tariffs in the National Capital Territory of Delhi (p1). It establishes a multi-year, cost-plus framework for existing and new generating stations that supply electricity to a distribution licensee, and it applies to tariff determination under Section 62 of the Electricity Act, 2003; tariffs discovered through Section 63 bidding are excluded (p2, p6). It comes into force on 1 April 2012 and is tied to a control period running to 31 March 2015 (p2–3).

Part A1 gives the short title, extent and commencement, and preserves the 2007 tariff regulations for certain existing projects for the period ending 31 March 2012 (p2). Part A2 defines the commercial, technical and despatch terms used in the regulation, including control period, COD, declared capacity, availability, heat rate, auxiliary consumption, change in law and useful life (p2–6). Part A3 sets the scope and excludes Section 63 bidding; Part A4 distinguishes existing stations whose PPA or tariff was already approved or adopted by the Commission from new stations declared commercial after the issue of the regulations or on/after 1 April 2012 (p6).

Part A5 sets the general approach: a Multi Year Tariff framework, business plans, baseline values, capital investment approvals, annual performance review and controllable performance targets, with underperformance not recoverable and overperformance retained by the generating company (p7–8). Part A6 contains the tariff-determination principles: capital cost admissibility and prudence check; additional capitalisation before and after the cut-off date; treatment of infirm power; debt-equity ratio; renovation and modernisation/life extension; interest and finance charges; working capital and interest on it; depreciation; return on equity and tax; O&M expenses; and secondary fuel oil expenses (p8–20).

Part A7 is the thermal generating station chapter. It fixes operational norms for the named existing Delhi plants — Rajghat, IP GTPS and PPCL — and generic norms for new stations covering availability, station heat rate, secondary fuel oil consumption and auxiliary consumption; it treats the norms as ceilings, allows improved PPA norms, permits relaxed norms and provides for review after R&M, derating or rerating (p19–23). It then specifies the two-part tariff, capacity-charge recovery formulae and incentives, PAF calculation, energy-charge rate and fuel-price build-up, UI charges, deemed generation, billing and payment, late payment surcharge, rebate and safety standards (p23–28).

Part A8 sets the MYT filing procedure, including business-plan and tariff filings, provisional billing for existing stations, end-of-control-period review and truing up (p28–31). Part A9 covers disposal of applications and the time frame for the tariff order; Part A10 provides for periodic and annual performance reviews; Part A11 gives the Commission powers to issue orders and practice directions, determine tariff suo motu, remove difficulties, relax provisions, interpret the regulations, conduct enquiries and amend (p31–33). Appendix I sets depreciation rates by asset class, and Appendix II sets project completion timelines by technology and unit size (p34–38).

Standard name
Generation Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

The regulation

Proposed changes (drafts with no final yet)

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document