Generation Tariff Regulations, 2011

Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2011

RegulationDated 19 Jan 2012In force from 1 Apr 2012No. F. 3(290)/Tariff/DERC/2011-12/C.F. 3180 dated 19th January, 2012

Replaced by Terms and Conditions for Determination of Tariff Regulations, 2017

See that regulation for the date it took effect and for anything it keeps in force.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on derc.gov.in ↗

Summary

Summary written by software, from pages 1 to 16 of 48. Check the regulator's original before you rely on it.

This is the DERC notification approving the Delhi Electricity Regulatory Commission (Terms and Conditions for Determination of Generation Tariff) Regulations, 2011, issued 19 January 2012 but commencing 1 April 2012 for a three-year term (p1). It applies across NCT Delhi to generation tariff determined under Section 62 for supply to a distribution licensee, excluding tariffs set through Section 63 bidding (p4). Existing PPAs or arrangements approved before the notification continue for their approved period to the extent of existing installed capacity; new stations are covered by these Regulations (p4).

The Regulations adopt a Multi Year Tariff framework for the Control Period 1 April 2012 to 31 March 2015, with business plan approval, baseline parameters, capital investment plan, annual performance review and truing up (p4–5). They set out tariff principles for capital cost and additional capitalisation, debt-equity treatment, renovation and modernisation, interest and finance charges, working capital, depreciation, return on equity, income tax and O&M expenses, including formulae and special or compensation allowances (p5–10).

Part A7 is the thermal-station operative core. It prescribes operational norms for existing Delhi plants and generic norms for other thermal stations, then defines tariff as capacity (fixed) and energy (variable) charges, with formulae for capacity charge recovery, PAF/DC, energy charge rate, fuel cost, incentives, UI charges and deemed generation (p11–14). It also covers billing and payment, beneficiary capacity shares, late payment surcharge, rebate and safety standards (p14–15).

Part A8 lays down the filing procedure: business plan contents, tariff application timelines, provisional billing for existing stations, annual performance review, truing-up refunds or recoveries and end-of-control-period review (p15–16).

Standard name
Generation Tariff Regulations, Transmission Tariff Regulations, Wheeling and Retail Supply Tariff Regulations, Multi Year Tariff Regulations
Primary topics
Generation tariff, Tariff determination, Multi Year Tariff (MYT)

Read with this

Proposed changes (drafts with no final yet)

Earlier drafts

Voltaic last read DERC's website for final documents on 24 Nov 2026 and for drafts on 23 Nov 2026. A document DERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on derc.gov.in ↗

Report an issue with this document