Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
3 documents match “energy storage obligation”.
Draft Procedure for Verification of Captive Status of Generating Plants in Telangana
Draft- Illustration… of electricity by the captive user may be either directly or through Energy Storage System: Provided further that the consumption by a subsidiary company as defined in clause (87) of section 2 of the Companies Act, 2013 (18 of 2013) or …
- 9. Verification of the consumption criteria of CGP as …… Technical losses in electrical network and energy storage system shall be included in the energy consumption of the captive users. The losses figures shall be as derived from the published data wherever its done at regular intervals and …
3 matching passages in this document
Detailed Procedure for Grant of Connectivity to Renewable Projects to ISTS
Draft- 2.1This Procedure shall be applicable to the following… i) Generation projects based on renewable energy sources, including hybrid projects based on renewables and storage, Solar Power Park Developer, Wind Power Park Developer, Wind-Solar Power Park Developer and Power park developer based on …
- 4. EligibilityAn entity intending to set-up generation projects based on renewable energy sources including hybrid projects on renewables and storage for a capacity of 50 MW or above:, (ii) An entity acting as a Lead Generator on behalf of the …
3 matching passages in this document
Draft Procedure for Grant of Connectivity to Renewable Projects to ISTS
Draft- DRAFT "PROCEDURE FOR GRANT OF CONNECTIVITY TO PROJECTS … › 4.1. Application for grant of Stage-I Connectivity can be …An entity intending to set-up generation projects based on renewable energy sources including hybrid projects on renewables and storage for a capacity of 50 MW or above:, (ii) An entity acting as a Lead Generator on behalf of the …
- DRAFT "PROCEDURE FOR GRANT OF CONNECTIVITY TO PROJECTS … › 2. Applicability… i) Generation projects based on renewable energy sources, including hybrid projects based on renewables and storage Solar Power Park Developer, Wind Power Park Developer and Wind-Solar Power Park Developer: ii) CTU, Central Government …
3 matching passages in this document