Draft Procedure for Grant of Connectivity to Renewable Projects to ISTS

DRAFT "PROCEDURE FOR GRANT OF CONNECTIVITY TO PROJECTS BASED ON RENEWABLE SOURCES TO INTER-STATE TRANSMISSION SYSTEM"

Draft procedureReleased with the notice dated 11 Apr 2018

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

Draft procedure for granting connectivity to renewable generation projects to the inter-State transmission system (ISTS), framed under the CERC Connectivity Regulations 2009 (p1). It establishes a two-stage process—Stage-I and Stage-II Connectivity—for solar, wind, wind-solar and hybrid renewable projects, including those with storage, and for government-authorised Solar/Wind/Wind-Solar Power Park Developers (p1). Stage-I and Stage-II may be applied for separately or simultaneously (p1).

Sections 2 and 4 set who may apply: renewable generation projects of 50 MW or above; a Lead Generator applying on behalf of constituent entities that individually are below 50 MW but collectively reach 50 MW; and authorised park developers (p1–2). Already-connected or already-granted capacity cannot get additional connectivity for the same project; capacity augmentation requires a fresh application (p2). Section 5 lists how pre-notification grantees are treated, including deemed Stage-I or Stage-II status, and how a parent company may let wholly owned subsidiaries use its connectivity (p3–4). It also addresses scope of dedicated transmission line works and bays (p5).

Stage-I Connectivity: Section 6 prescribes online application (FORMAT-RCON-I), supporting documents, application fee parity with the 2009 Regulations, scrutiny, deficiency cure and forfeiture on closure (p5–6). Section 7 requires CTU to study available margin and grant Stage-I within a specified period, indicating a primary and an alternate location, the voltage level, and the minimum dedicated line capacity by voltage class; the grant carries no vested right to a particular location or bay (p6–7). Section 8 requires quarterly progress updates on milestones and CTU website updates (p7–8).

Stage-II Connectivity: Section 9 sets eligibility milestones—competitive-bid selection, land rights, PPA duration and capacity, financial closure or equity release—and post-grant milestones, with revocation for failure (p8–10). Section 10 covers processing on first-come-first-serve, part-capacity grants, intimation contents, the Transmission Agreement and the Connectivity Bank Guarantee (Conn-BG), including its discharge after commencement of evacuation (p10–12). Section 11 requires quarterly monitoring, completion of dedicated line and pooling station within the stipulated period, and CEA Electrical Inspectorate certification (p13). Section 12 adopts CEA technical standards and specifies design requirements for the dedicated transmission line and generator pooling station (p13–15).

Sections 13–15 allow enhancement of connectivity, sharing of dedicated infrastructure with SPVs or third parties, a ceiling on one-time sharing charges, and CTU monitoring of underutilization (p15–18). Section 16 requires CTU to plan ISTS pooling stations in consultation with MNRE, route the plan through the Standing Committee and obtain regulatory approval, and share available ISTS capacity with bidding agencies (p18). The annexures provide the affidavit, Stage-I/Stage-II/enhancement application and intimation formats, monitoring tables, the bank guarantee proforma and the utilization reporting format (p19–39).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Network planning and investment, Technical standards

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document