Detailed Procedure for Grant of Connectivity to Renewable Projects to ISTS

DETAILED PROCEDURE FOR "GRANT OF CONNECTIVITY TO PROJECTS BASED ON RENEWABLE SOURCES TO INTER-STATE TRANSMISSION SYSTEM"

Draft amendmentReleased with the notice dated 24 Jul 2020

Draft

A proposal, not law. Voltaic holds no final regulation made from this draft.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software. Check the regulator's original before you rely on it.

This is the Detailed Procedure under Regulation 27 of the CERC Connectivity Regulations, 2009, setting out how renewable generation projects, hybrid projects with storage, and solar/wind park developers obtain connectivity to the inter-State transmission system (ISTS). It applies to applicants covered by specified sub-clauses of the Connectivity Regulations and to CTU, RLDCs, SLDCs, STUs, distribution companies and renewable energy implementing agencies (p1).

Connectivity is processed in two stages — Stage-I and Stage-II — which may be applied for separately or together (p2). Stage-I eligibility is pegged at projects of 50 MW or above, aggregated lead-generator applications meeting the same threshold, and government-authorised park developers (p2–3). The Procedure sets out the online application process, scrutiny and deficiency timelines, grant of Stage-I connectivity within 60 days, progress monitoring, and the principle that Stage-I creates no vested right to a particular bay or location (p5–8). Stage-II eligibility turns on either a letter of award/PPA from a competitive-bidding process or on land and financial-closure milestones (p8–11). It prescribes conditions and timelines for Stage-II grantees, bank guarantees (Conn-BG1 and Conn-BG2) tied to connectivity quantum and bay voltage, revocation and encashment consequences, monitoring obligations, and technical requirements for dedicated transmission lines and pooling stations (p11–18). It also provides for sharing of connectivity and dedicated infrastructure, including one-time charges, and for CTU coordination with MNRE in transmission planning (p18–21).

The annexures contain application and intimation formats, monitoring formats, an affidavit, a bank-guarantee proforma, a utilisation format, and a model lead-generator agreement (p22–62). Existing grantees are transitioned through a deemed-status table (p3–4). The Procedure comes into force on the date notified by the Commission, with certain park developers and hybrid projects to be notified separately (p1–2).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Technical standards, Network planning and investment

Read with this

Other copies of these documents (7)

Earlier drafts

4 more documents belong here and are not on Voltaic: 3 drafts or notices on a draft not held as English text and 1 draft or notice on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.