Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
4 documents match “energy storage obligation”.
Methodology for determination of Green Energy Open Access Charges Regulations, 2024
- NAGALAND ELECTRICITY REGULATORY COMMISSION › 3. Definitions… liquid fuel or combination of these as its primary source of energy, which are used in Thermal Generating Station for generating electricity; (i) "Green Energy" means the electrical energy from renewable sources of energy including hydro …
- CHAPTER 2 GREEN ENERGY OPEN ACCESS CHARGES › 8. Cross subsidy surcharge… Cross subsidy surcharge a) If Green energy open access facility is availed by a cross-subsidising consumer of a distribution licensee of the State, then such consumer, in addition to transmission and wheeling charges, shall pay cross …
3 matching passages in this document
Nagaland Terms and Conditions for Determination of Tariff Regulations, 2010
Replaced byMulti Year Tariff Regulations, 2016- (viii) 'Declared Capacity or DC' means'Storage type power station' means a hydro electric power generating station associated with large storage capacity to enable variation of generation of power according to demand; (xx) 'Saleable Primary Energy' means the quantum of primary …
- (1) Normative capacity index for recovery of full capacity …Storage type and Run-of-river power stations with pondage 80% (b) After first year of commercial operation of the generating station (i) Purely Run-of -river Power Stations 90% (ii) Storage type and Run-of-river power stations with pondage …
3 matching passages in this document
Multi Year Tariff Regulations, 2016
- 4. Multi-Year Ta riff framework › 7. Business Plan… under Nagaland Electricity Regulatory Commission (Renewable Purchase Obligation and its Compliance) (Second Amendment) Regulations, 2016 as amended from time to time and the target set, if any, for Energy Efficiency (EE) and Demand Side …
- (iii) Gas Turbine/Combined Cycle generating stations › 52.1 Normative annual plant availability factor (NAPAF)… Storage and Pondage type plants with head and Minimum Draw Down Level (MDDL) of up to 8%, and where plant availability is not Storage and Pondage type plants with head variation between FRL and MDDL of more than 8%, …
3 matching passages in this document
Generation Tariff for Renewable Energy Regulations, 2011
1 amendment on Voltaic
- Abbreviations › 3. Scope and extent of application… cases where tariffs for generation and sale of electricity from Renewable Energy Sources to the distribution licensees within the State of Nagaland, are to be determined by the Commission under Section 62 of the Act. …
- 4. Eligibility Criteria for qualifying as Generating … › 5. Obligations and duties of the Generating Station… from time to time for fixation of tariff for different renewable source of energy. (9) The RE based Generating Stations and Co-generating Stations shall coordinate with State Transmission Utility/Distribution Licensee for the purpose of …
3 matching passages in this document