Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
3 documents match “energy storage obligation”.
RE Curtailment Management Procedure for Wind and Solar Generation, 2024
- Table of Contents › 4.0. Definitions… of Wind or Solar Energy Generators means the cumulative capacity rating of the Wind turbines, Solar inverters or Solar thermal generators that are capable of generating power in a given time block as declared by such Generators or …
- Table of Contents › 4.0. Definitions… or a single agency appointed by the majority of the Wind or Solar Energy Generators in the State in terms of installed capacity, to perform the functions and discharge the obligations specified in these Regulations. …
3 matching passages in this document
Procedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
- TERMS AND CONDITIONS.-… If both the main meter and the check meter fail to record energy either due to the blowing of the P.T. fuses or due to any other causes, the energy imported or exported may be arrived at based on the standby meter, if available, or by …
- 3.11. Interchange of power with the grid › 4.0. Provision of interface meters… Energy accounting and settlement shall be done in 15 minutes block. From the energy / demand recorded in the Consumer meter, OA entitlement shall first be adjusted to arrive at energy / demand consumption from DISCOM. …
3 matching passages in this document
Procedure for Grant of Connectivity to the Intra-State Transmission System
- 3.11. Interchange of power with the grid › 4.0. Provision of interface meters… Energy accounting and settlement shall be done in 15 minutes block. From the energy / demand recorded in the Consumer meter, OA entitlement shall first be adjusted to arrive at energy / demand consumption from DISCOM. 4.2. …
- 4. Operation and Maintenance:- › 5. Metering Arrangements:-… If both the main meter and the check meter fail to record energy either due to the blowing of the P.T. fuses or due to any other causes, the energy imported or exported may be arrived at based on the standby meter, if available, or by …
3 matching passages in this document