TNERC · Tamil Nadu Electricity Regulatory Commission
Procedure for Grant of Connectivity to the Distribution System, 33 kV and below — under Grid Connectivity and Intra State Open Access Regulations, 2014
Detailed Procedure for Grant of Connectivity to the Distribution System
ProcedureDate not stated
Made under the Grid Connectivity and Intra-State Open Access Regulations, 2014.
Summary
Summary written by software, from pages 1 to 36 of 40. Check the regulator's original before you rely on it.
This is TANGEDCO's procedural manual, approved by TNERC, for granting grid connectivity to the distribution system at 33 kV and below. It is made under Regulation 43 of the TNERC (Grid Connectivity and Intra State Open Access) Regulations, 2014, and is to be read with those Regulations, the Electricity Act 2003 and prevailing TNERC codes and orders (p1, p3).
Sections 1–2 set scope, eligibility and the nodal agency. Eligibility as stated is a contracted demand below 10 MW, or supply at 33 kV and below, or installed capacity under 15 MW, or connectivity at 33 kV and below; generators and consumers needing parallel operation without export are also covered (p3). Open access customers already connected cannot seek additional connectivity for the same capacity, and a pooling sub-station case allows a lead generator to sign on behalf of the group (p3–5).
Section 3 is the operational core: application format and supporting documents, transparency disclosures on the licensee's and SLDC's websites, voltage-level allocation, a project-preparedness document list, the application fee (halved for co-generation and renewables), registration and defect-return timelines, the interconnection study and decision window, execution of the power evacuation scheme agreement, cost estimation for bays and augmentation, construction, ownership and O&M of the dedicated line, and cancellation consequences (p5–10). It also deals with existing generators, the distinction between connectivity and open access, infirm power injection during testing, pre-synchronisation clearances and declaration of COD (p9–12).
Sections 4–6 cover interface meters with AMR and block-wise energy accounting (p12), startup power (p12–13), and parallel operation without open access including parallel operation charges (p13). Section 7 gives general provisions, a time-bound land-acquisition condition for renewable applicants with a paid extension, and a deadline for the licensee to move the whole process online, followed by a process abstract (p14–15).
The annexures supply the working documents: Format IA with its document checklist, generator and transformer data tables and lead-generator declaration (p16–27); Format IB, the power evacuation scheme agreement (p28–30).
Read with this
The regulation
- Dated 13 Mar 2014Grid Connectivity and Intra-State Open Access Regulations, 2014
Amendments and corrections
- Dated 16 Mar 2022Grid Connectivity and Intra State Open Access Regulations, 2014 — Amendment, 2022
- Dated 18 Sep 2025Changes some provisions: Terms and Conditions for Green Energy Open Access Regulations, 2025
Procedures and orders made under it
Proposed changes (drafts with no final yet)
Earlier drafts
One more document belongs here and is not on Voltaic: a copy in another language.
Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.
Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.