TNERC · Tamil Nadu Electricity Regulatory Commission

Procedure for Grant of Connectivity to the Intra-State Transmission System

Detailed Procedure for Grant of Connectivity to the Intra-State Transmission system

ProcedureDate not stated

Made under the Grid Connectivity and Intra-State Open Access Regulations, 2014.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on tnerc.tn.gov.in ↗

Summary

Summary written by software, from pages 1 to 37 of 42. Check the regulator's original before you rely on it.

This is the TNERC-approved Detailed Procedure for Grant of Connectivity to the Intra-State Transmission System, prepared by TANTRANSCO under Regulation 43 of the TNERC (Grid Connectivity and Intra State Open Access) Regulations, 2014 (p1, p3). It applies to applications for connectivity to the STU/transmission licensee system at above 33 kV, from the date notified by the Commission, and is to be read with the 2014 Regulations, the Electricity Act 2003 and prevailing TNERC regulations/orders (p3).

Chapter 2 identifies who must obtain connectivity: new generators with or without storage; consumers with contracted demand of 10 MW and above at above 33 kV; generating stations of 15 MW and above or requiring connectivity above 33 kV; and generators/consumers needing parallel operation without export (p3). It routes transmission-system applications to the STU and distribution-system applications to the distribution licensee, with a nodal-agency table for fossil-fuel and renewable applicants (p4), and covers pooling substations, lead generators and tripartite agreements (p4–5).

Chapter 3 sets the application process: Format IA, supporting documents, website disclosure, fee and registration, return/resubmission timelines, grant or refusal after interconnection study within 30 days, dedicated-line construction, power evacuation scheme agreement, cost estimates/payments, and the grid connectivity agreement format after approval (p5–13). It also governs changes requiring fresh applications, interchange of power, infirm power testing before COD, synchronization and COD declaration (p7–13).

Chapter 4 specifies interface/check/energy-accounting meters with AMR and SLDC data connectivity, including 15-minute-block accounting and captive-plant metering (p14). Chapter 5 covers startup power through the distribution licensee and separate construction power (p14–15). Chapter 6 covers parallel operation without open access and parallel operation charges (p15). Chapter 7 contains general provisions, review/amendment by the nodal agency, renewable-generator load-flow and land milestones, online application rollout, and compliance with Commission/MoP/MNRE instruments (p15–16).

The annexures provide Format IA application and document list (p18–28), Format IB power evacuation scheme agreement (p29–31), and Format IC grid connectivity agreement covering definitions, interfacing, conditions precedent, O&M, protection and metering. The procedure expressly states that connectivity does not itself confer open-access interchange rights (p12, p32).

Standard name
Connectivity and GNA Regulations, Open Access Regulations
Primary topics
Connectivity and GNA, Metering, Energy accounting and settlement

Read with this

Voltaic last read TNERC's website for final documents on 29 Sep 2026 and for drafts on 24 Nov 2026. A document TNERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on tnerc.tn.gov.in ↗