Search the library
Filters
Topic
DistributionGeneral / AdministrativeRenewable EnergyTariff & PricingGrid OperationsOpen AccessLicensing & ComplianceTransmissionYear
3 documents match “T-GNA corridor allocation”.
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022
- Allocation of Transmission Corridor under GNA and T-GNA › 36. Allocation of Transmission CorridorOnce the day ahead schedule is finalised for the GNA grantees, schedule for T-GNA grantees under Advance application category of T-GNA shall be finalised over the balance transmission corridor. …
- 27.1. NOAR shall… to RLDCs and SLDCs and act as a repository of information related to T-GNA including standing clearance issued by RLDCs and SLDCs, availability of transmission corridor, pending applications, and T-GNA granted and rejected; …
3 matching passages in this document
Indian Electricity Grid Code Regulations, 2023
- 48. SCHEDULING FROM ALTERNATE SOURCE OF POWER BY A … › 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE …Other drawee T-GNA grantees who are regional entities, shall furnish time block-wise requisition for drawl to concerned RLDC in accordance with contracts by 9 AM of "D-1" day. (iii) Allocation of corridors by RLDC for T-GNA grantees: …
- 48. SCHEDULING FROM ALTERNATE SOURCE OF POWER BY A … › 49. PROCEDURE FOR SCHEDULING AND DESPATCH FOR INTER-STATE …Allocation of corridors by RLDC for GNA grantees (i) RLDC shall check if drawl schedules as requisitioned by drawee GNA grantees can be allowed based on available transmission capability: …
3 matching passages in this document
Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025
- 53. Amendment to Regulation 36.1 of the Principal …… the available transmission corridor shall be allocated to the GNA grantees in proportion to their total GNA, and in case of constraint in the transmission system outside the region, …
- 52. New Regulation 34A › 34A Operating charges for transactions under T-GNA"34A Operating charges for transactions under T-GNA 34A.1 Operating charges at the rate of Rs 1000 per day or part of the day for Advance T-GNA or Exigency T-GNA under bilateral transactions shall be payable by the applicant to the Host …
3 matching passages in this document