Skip to content

CERC · Central Electricity Regulatory Commission

Indian Electricity Grid Code Regulations, 2023

Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023

Regulation · Gazette copyDated 29 May 2023Published in the Gazette 11 Jul 2023No. L-1/265/2022/CERC.— dated 29th May, 2023

The Gazette copy of the Indian Electricity Grid Code Regulations, 2023.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 121 of 185. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission (Indian Electricity Grid Code) Regulations, 2023, published in the Gazette of India, Extraordinary, Part III Section 4 (p1). It is notified under s.79(1)(h) read with s.178(2)(g) of the Electricity Act 2003 (p103). The preamble (pp102–103) sets out the statutory division of labour between the CEA (grid standards), the Commission (grid code and quality, continuity and reliability standards), NLDC, RLDCs, RPCs, CTU/STUs, SLDCs, generating companies and licensees, and records that State Commissions must frame State Grid Codes consistent with this Code.

The notification is dated 29 May 2023 (p102) and the Gazette issue 11 July 2023 (p1). Commencement is deferred: the regulations take effect from a date the Commission notifies, and different dates may be fixed for different regulations (p103). No commencement date is printed.

Chapter 1 (pp103–111) gives the short title, the scope — all users, SLDCs, Renewable Energy Management Centres, RLDCs, NLDC, CTU, STUs, licensees, RPCs, Settlement Nodal Agencies, Qualified Coordinating Agencies and power exchanges — treats DVC as a regional entity and separate control area, BBMB and SSP stations as regional entities, and any inter-connected country as a separate control area, and defines over 130 terms, many by cross-reference to other CERC and CEA instruments.

Chapter 2, the Resource Planning Code (pp111–112), lays out integrated resource planning: distribution licensees' demand estimation across long, medium and short horizons, State-level aggregation by the STU, generation resource adequacy and procurement planning, an annual NLDC national simulation to assist States, a planning reserve margin framed by CEA, and demonstrable adequacy targets approved by SERCs backed by a non-compliance charge.

Chapter 3, the Connection Code (pp113–114), specifies technical and design criteria for connectivity (granted by CTU under the GNA Regulations), the standards users must comply with, the procedure for first-time energization, connectivity agreements, a joint system study six months ahead of energization, and data and communication facilities.

Chapter 4, the Protection Code (pp114–117), requires a uniform regional protection protocol developed by each RPC, annual review of protection settings with a centralised database, internal annual and five-yearly third-party protection audits, monthly reporting of dependability, security and reliability indices, System Protection Scheme design and review, and disturbance recorder and event logger requirements.

Chapter 5, the Commissioning and Commercial Operation Code (pp117–121), specifies start-up power and infirm power drawal and injection windows, their charges and stop-supply triggers; the data to be furnished before notice of trial run (Table 1, p118); notice and conduct of trial run; trial-run rules for thermal, hydro, wind/solar/ESS/hybrid units and for transmission elements; and the OEM documents and tests required before declaration of commercial operation.

Standard name
Grid Code
Primary topics
Grid operation and grid code, Scheduling and despatch, Connectivity and GNA

Read with this

The regulation

Amendments and corrections

Commencement notices and reasons

Other copies of these documents (1)

Earlier drafts

6 more documents belong here and are not on Voltaic: 4 drafts or notices on a draft not held as English text and 2 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document