CERC · Central Electricity Regulatory Commission

Connectivity and General Network Access to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025

Central Electricity Regulatory Commission (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2025

Amendment · Gazette copyDated 31 Aug 2025F. No. L-1/261/2021/CERC dated 31st August, 2025

The Gazette copy of the Connectivity and GNA to the inter-State Transmission System Regulations, 2022 — Third Amendment, 2025.

Full text needs a Voltaic key. A key opens the full text of 20 different documents a day, on this site and in your AI together. The summary, the reading list and the regulator's original are open to everyone.

Enter your key

Your key is the last part of the connector address we sent you. This browser remembers it until you choose to forget it. No key yet? Ask for one at hello@voltaicplatform.com.

Ask for a keyOpen the regulator's original on cercind.gov.in ↗

Summary

Summary written by software, from pages 1 to 71 of 90. Check the regulator's original before you rely on it.

This is the Central Electricity Regulatory Commission's Third Amendment to the GNA/Connectivity Regulations, 2022. The notification says the regulations come into force from the date of publication in the official Gazette; the Gazette date is not printed (p42).

The English text inserts definitions for 'Cluster of ISTS substations', 'Connectivity Grantee', 'Host RLDC', and the solar-hour / non-solar-hour access categories (pp42–43). It then rewrites the withdrawal regime for connectivity and GNA applications, specifying stage-wise treatment of application fees, land documents and Conn-BG1/2/3, and creating an option to pay in lieu of bank guarantee encashment (pp43–46).

Connectivity eligibility and processing rules are amended: a BBMB-specific route for REGS/ESS, a non-solar-hour access route for wind/ESS, solar-hour access treatment for solar and hybrid projects, and revised documentation routes under Regulation 5.8 (pp46–53). New provisions cover land requirements, change of land parcel, and detailed solar/non-solar hour access modalities with worked examples (pp53–56).

Later amendments deal with closure of applications where augmentation is not approved, bank guarantee formats and amounts, final grant contents, change of renewable source, connectivity agreements, monitoring of Regulation 11A compliance and connectivity utilisation, conversion between documentation routes, control of the Connectivity Grantee, and reallocation of vacant terminal bays within a Cluster of ISTS substations (pp56–68). The final pages amend transfer of connectivity, GNA eligibility and STU applications for intra-State entities (pp69–71).

Standard name
Connectivity and GNA Regulations
Primary topics
Connectivity and GNA, Scheduling and despatch, Energy storage deployment

Read with this

Procedures and orders made under it

Consolidated copies, for reference (1)

Other copies of these documents (4)

Earlier drafts

16 more documents belong here and are not on Voltaic: 12 drafts or notices on a draft not held as English text and 4 drafts or notices on a draft.

Voltaic last read CERC's website for final documents on 24 Nov 2026 and for drafts on 19 Nov 2026. A document CERC issued after the page that lists it was read may not be held by Voltaic yet.

How to read a Voltaic page

Full text on Voltaic needs a key: enter your key near the top of this page. The regulator's original is open to everyone.

Open the regulator's original on cercind.gov.in ↗

Report an issue with this document